Name of the Project
Olkiluoto (OL) 3 European pressurised reactor (EPR) project.
Location
Western Finland.
Project Owner/s
Teollisuuden Voima Oyj (TVO).
Project Description
The project involves the construction of the OL3 nuclear power plant unit, which will include an EPR adjacent to the existing OL1 and OL2 units.
OL3 will have an output of about 1 600 MW and once operating at full capacity, the OL3 plant will produce about 13 TWh/y of electricity and meet about 14% of Finland's electricity demand.
Potential Job Creation
Not stated.
Capital Expenditure
The project is estimated at more than €3-billion.
Planned Start/End Date
Grid connection is scheduled for October 2021, with regular electricity production due to start in February 2022.
Completion of the reactor was originally scheduled for 2009, but the project has had various delays and setbacks.
Latest Developments
The loading of fuel assemblies into the OL3 EPR started on March 27. This follows the receipt of a permit from Finland’s Radiation and Nuclear Safety Authority.
The loading of fuel will be followed by a commissioning phase lasting several months, during which TVO will undertake a new series of hot functional tests to verify that the plant's systems work correctly.
These tests must be completed before the unit achieves first criticality and commissioning for commercial operation. TVO requires authorisation from STUK before advancing from one commissioning phase to another.
Key Contracts, Suppliers and Consultants
Areva–Siemens Consortium, comprising Areva GmbH, Areva NP SAS and Siemens AG (plant supplier).
Contact Details for Project Information
TVO +358 2 83 811.
Comments
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation