Politics suppressing rail infrastructure build in Africa
VISHAAL LUTCHMAN The lack of continuity in government leads to unfinished projects and decaying rail infrastructure
Election cycles and governance have an inherently negative impact on rail infrastructure planning and the construction thereof in Africa, says multidisciplinary engineering consultancy WSP Africa transport and infrastructure director Vishaal Lutchman.
He adds that many African countries have fallen victim to high levels of political turbulence, adding that governments that come into power typically do not follow through on many of the initiatives of the previous regime.
“Planning is not good in terms of a growth path in such countries, where a fragmented approach is often adopted to infrastructure development without strategic planning, compared with South Africa, where infrastructure is planned well in advance,” he elaborates.
Lutchman points out that the lack of continuity in government leads to unfinished projects and decaying rail infrastructure. He says this is evidenced by many case studies across Africa.
“For example, a built project will be initiated and, while construction is under way, there is a regime change that also results in major projects being halted while sovereign budget spending is reviewed – and sometimes reallocated. With this, some projects end up being abandoned altogether.”
He says it is “disheartening” to see such projects in Africa go to waste because “government, for ethnic reasons, no longer wants to uplift a certain community in favour of another, with the focus completely shifting to other initiatives”.
However, he mentions that implementation in many African countries is easier than in South Africa – “the regulatory environment is less prohibitive making it easier to sign engineering, procurement and construction agreements and concessions, but unfortunately, there is a missed opportunity in terms of planning the implementation of projects”.
A fresh approach needs to be taken in Africa and governments need to realise the importance of long-term planning and implementing the improvement of rail infrastructure using African technology, rather than short-term plans that change or are disregarded with shifts in power, Lutchman concludes.
Comments
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation