https://newsletter.en.creamermedia.com

Port of Setúbal floating offshore wind logistic hub, Portugal

Port of Setúbal in Portugal

Photo by RWE

29th November 2024

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Port of Setúbal floating offshore wind logistic hub.

Location
Port of Setúbal, south of Lisbon, in Portugal.

Project Owner/s
RWE is collaborating with the Port Authority of Setúbal to facilitate enhancements in its port infrastructure.

Project Description
Portugal has favourable wind speeds and is preparing for its first offshore wind auction. 

The Portuguese government has agreed on floating offshore wind as the preferred technology for offshore wind, based on the country’s considerable water depths.

RWE and the Port Authority of Setúbal plan to explore the potential of the Port of Setúbal to become an important industrial hub for the marshalling, assembly and deployment of key components for large-scale floating offshore wind projects.

Early development of the national port infrastructure will position Portugal to harness the full potential of the floating offshore wind industry, and potentially explore opportunities for industrial synergies beyond the Portuguese market.

Potential Job Creation
Not yet determined.

Capital Expenditure
No information provided.

Planned Start/End Date
To be confirmed.

Latest Developments
None stated.

Key Contracts, Suppliers and Consultants
Not disclosed.

Contact Details for Project Information
RWE, tel +49 201 5179-5008 or email communications@rwe.com.
Port Authority of Setúbal, tel +351 265 542000 or email geral@portodesetubal.pt.

Edited by Martin Zhuwakinyu
Creamer Media Senior Deputy Editor

Comments

Latest News

Magazine cover image
Coal ash liability can be asset for multiple industries
Updated 2 hours 36 minutes ago By: Marleny Arnoldi

Showroom

SAIMC (Society for Automation, Instrumentation, Mechatronics and Control)
SAIMC (Society for Automation, Instrumentation, Mechatronics and Control)

Education: Consulting with member companies to obtain the optimal benefits from their B-BBEE spending, skills resources as well as B-BBEE points

VISIT SHOWROOM 
Victaulic
Victaulic

Since 1919, Victaulic’s innovative solutions and design services continue to increase construction productivity and reduce risk, ensuring projects...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.061 0.155s - 192pq - 2rq
Subscribe Now