Renergen hopeful of clearing well drilling delays at Virginia with well integrity tests
Emerging domestic natural gas and helium producer Renergen is progressing with the drilling of the P2V2 well at its Virginia gas project, in the Free State.
The well has been beset with delays since being spudded in June; however, the company on November 27 said it now had two drill rigs active on the project, with Renergen having recently successfully set casing at the base of the Karoo sequence.
Following this, borehole integrity tests will be conducted, prior to re-entering the hole with directional drilling equipment.
Going forward, Renergen plans to drill directionally to intersect the subvertical fracture systems, which are the conduits for the gas – low pressure methane and helium – flows in nearby producing wells.
Meanwhile, Renergen reports that the MDR1 well – a legacy well about 300 m from a known gas-productive fracture and previously cased to the base of the Karoo sediments – has been re-entered with a directional drilling unit, also on a turnkey basis.
Renergen reports that, while directional control from the base of Karoo has so far proved to be slower to drill, encouraging gas shows are clearly evident in the drilling mud. Subject to resolving the directional control in the well, Renergen plans to drill ahead to the target fractures before evacuating the drilling mud and flow-testing the hole.
Planning is also advanced for an additional three-well programme with a new drilling contractor, with operations expected to commence in the next two weeks.
Renergen will accumulate all the data from the current drilling programme and use this to inform the reserves update which will follow several weeks later.
Comments
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation