Rooppur nuclear power plant, Bangladesh – update


Name of the Project
Rooppur nuclear power plant (NPP).
Location
Ishwardi Upazilla, 160 km from Dhaka, in Bangladesh.
Project Owner/s
Bangladesh Atomic Energy Commission (BAEC).
Project Description
The Rooppur NPP will comprise two VVER-1200 reactors with a total capacity of 2 400 MW.
Potential Job Creation
Not stated.
Capital Expenditure
$12.65-billion.
Planned Start/End Date
Unit 1 is scheduled for completion in 2024 and Unit 2 in 2025.
Latest Developments
World Nuclear News has reported that the tests for tightness and strength of the containment building at the NPP have been conducted successfully.
During the process, a compressor was used and the pressure was increased to the design value of 4.6 kgf/cm2 and a series of tests was carried out to "confirm the tightness of the structure and its ability to withstand internal loads that occur in abnormal conditions".
The reactor's hermetic enclosure is "a physical barrier made of prestressed reinforced concrete with an internal sealing steel lining. It is designed to prevent the release of radioactive substances into the environment in the event of an emergency and to localise them, as well as to protect against possible external influences. The enclosure serves as the last protective barrier in the event of a hypothetical accident,” Rosatom has explained.
Key Contracts, Suppliers and Consultants
Various divisions of Rosatom are in charge of manufacturing reactor vessels, steam generators, pumps, heat-exchangers and other equipment.
Contact Details for Project Information
BAEC, tel +880 2818 1846 or fax +880 2818 1842.
Comments
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation