Sabodala-Massawa mine solar photovoltaic plant, Senegal – update

Image of solar panel system

8th March 2024

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Sabodala-Massawa mine solar photovoltaic (PV) plant.

Location
Kedegou region, Senegal.

Project Owner/s
Endeavour Mining.

Project Description
Endeavour has decided to move ahead with the 37 MWp PV solar facility capable of generating about 73 GWh/y solar energy. The plant will complement the 36 MW heavy-fuel oil power plant that is being expanded as part of a brownfield expansion at the Sabodala-Massawa mine.

A 16 MW battery system will also be built to regulate power supply and ensure that fewer generators are required.

The project will significantly lower fuel consumption and power costs while reducing greenhouse-gas emissions once commissioned.

The solar plant will enable operations to function with only one generator active during clear-sky days. The hybridisation of the heavy fuel oil power plant will allow for savings of about 13-million litres of fuel and a 24% reduction in carbon dioxide (CO2) emissions a year, equivalent to 39 600 t of CO2, while reducing overall power cost by an estimated 22% a year.

Potential Job Creation
Not stated.

Capital Expenditure
The capital for the solar facility is expected to amount to $55-million.

Planned Start/End Date
The project is expected to be commissioned in early 2025.

Latest Developments
None stated.

Key Contracts and Suppliers
Dornier Suntrace (engineer).

Contact Details for Project Information
Endeavour Mining, tel +44 203 011 2723 or info@endeavourmining.com.

Edited by Creamer Media Reporter

Comments

 

Showroom

Essentra Components
Essentra Components

We are responsible manufacturers of essential components. Manufacturing 80 million parts a week, we have over 1 billion parts in stock.

VISIT SHOWROOM 
AutoX
AutoX

We are dedicated to business excellence and innovation.

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Magazine round up | 13 June 2025
Magazine round up | 13 June 2025
13th June 2025
Astec showcases benefits of modular plants
Astec showcases benefits of modular plants
11th June 2025

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.148 0.296s - 190pq - 2rq
Subscribe Now