https://newsletter.en.creamermedia.com
PROJECT
PROJECT
project

Sigma Lithium to wrap up review by year-end

2nd November 2023

By: Creamer Media Reporter

     

Font size: - +

Brazil-focused Sigma Lithium, listed on the Nasdaq and TSX-V, said on Wednesday that it had progressed its strategic review process to a final round, with consortiums formed among certain strategic parties.

The Vancouver-based company has received “significant” global interest, it said in a statement, attributing the interest to the large mineral resource of its Grota do Cirilo project, coupled with the low-cost openpit mineral reserves.

Phase 1 of the project is expected to produce 270 000 t/y of Triple Zero Green Lithium. If it is determined to proceed after completion of an ongoing feasibility study, Phase 2 and 3 of the project are expected to increase production to 766 000 t/y.

Sigma stated that it would complete the strategic review process by the end of the year.

 

Edited by Creamer Media Reporter

Comments

Latest News

An image showing the Self-Employed Material Recycler Training Programme
Plastics SA launches informal recycler training programme
Updated 3 hours ago By: Tasneem Bulbulia

Showroom

The Southern African Institute of Mining and Metallurgy
The Southern African Institute of Mining and Metallurgy

The SAIMM started as a learned society in 1894 after the invention of the cyanide process that saved the South African gold mining industry of the...

VISIT SHOWROOM 
SAIMC (Society for Automation, Instrumentation, Mechatronics and Control)
SAIMC (Society for Automation, Instrumentation, Mechatronics and Control)

Education: Consulting with member companies to obtain the optimal benefits from their B-BBEE spending, skills resources as well as B-BBEE points

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Photo of Martin Creamer
On-The-Air (15/11/2024)
15th November 2024 By: Martin Creamer

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:1.188 1.294s - 190pq - 2rq
Subscribe Now