https://newsletter.en.creamermedia.com
Africa|Construction|Energy|Financial|Iron Ore|PROJECT|Projects|Renewable Energy|Renewable-Energy|Solar
Africa|Construction|Energy|Financial|Iron Ore|PROJECT|Projects|Renewable Energy|Renewable-Energy|Solar
africa|construction|energy|financial|iron-ore|project|projects|renewable-energy|renewable-energy-company|solar

Sishen solar PV project, South Africa

Image of bucket loader at Sishen mine

Photo by ©Creamer Media

6th September 2024

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Sishen solar PV project.

Location
Sishen mine, in the Northern Cape, South Africa.

Project Owner/s
Kumba Iron Ore.

Project Description
Kumba is undertaking the construction of a 63 MW solar PV plant that will reduce Scope 2 carbon emissions by about 33%, a 15% saving on Sishen’s total carbon emissions in the first stage, with the rest of the targeted 2030 reductions to be delivered through other wheeled wind and solar renewable-energy projects.

Potential Job Creation
Not stated.

Capital Expenditure
Not stated.

Planned Start/End Date
The construction on the solar PV plant is expected to start once financial close is reached.

Latest Developments
The site at Sishen is being prepared using bulk earthworks, which is due for completion in the second half of 2024.

Key Contracts, Suppliers and Consultants
None stated.

Contact Details for Project Information
Kumba Iron Ore, tel +27 12 683 7000/7111 or email investorrelations.kumba@angloamerican.com.

Edited by Martin Zhuwakinyu
Creamer Media Senior Deputy Editor

Comments

Showroom

Immersive Technologies
Immersive Technologies

Immersive Technologies is the world's largest, proven and tested supplier of simulator training solutions to the global resources industry.

VISIT SHOWROOM 
Rittal
Rittal

Rittal is a world leading provider of top-quality integrated systems for enclosures, power distribution, climate control, IT infrastructure and...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Magazine round up | 14 March 2025
Magazine round up | 14 March 2025
14th March 2025

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.119 0.266s - 172pq - 2rq
Subscribe Now