https://newsletter.en.creamermedia.com
Exploration|Iron Ore|Mining|PROJECT|Drilling
Exploration|Iron Ore|Mining|PROJECT|Drilling
exploration|iron-ore|mining|project|drilling

Stockpiles could add potential at Buena Vista

16th August 2023

By: Esmarie Iannucci

Creamer Media Senior Deputy Editor: Australasia

     

Font size: - +

PERTH (miningweekly.com) – Iron-ore junior Magnum Mining & Exploration will evaluate stockpiles at its Buena Vista project, in Nevada, as potential mill feed.

The company on Wednesday said that the stockpiles were estimated to hold between 411 000 t to 894 000 t at between 15% and 45% iron, exclusive of the existing indicated and inferred resource of 232-million tonnes, at 18.6% iron at Buena Vista.

“The stockpiles at Buena Vista potentially represent a quick win when the beneficiation plant is built. It will save considerable mining costs if they prove to be of sufficient grade to be economic,” said Magnum CEO Neil Goodman.

“Work to date indicates this may be the case although more work needs to be done to confirm bulk grades.”

Drilling is planned to fully characterise the stockpiles.

Magnum earlier this week released a scoping study for Buena Vista, which estimated that the project could produce 1.6-million tonnes a year of concentrate over a mine life of 25 years.

The scoping study estimated capital cost of between $182-million and $378-million and an operating cost of between $44/t and $90/t, with the internal rate of return ranging between 26% and 54%, and the net present value between $360-million and $745-million.

Edited by Creamer Media Reporter

Comments

Showroom

AutoX
AutoX

We are dedicated to business excellence and innovation.

VISIT SHOWROOM 
Klüber Lubrication
Klüber Lubrication

Klüber Lubrication ensures that the world’s essential systems—drive units, machines, and water flow—operate efficiently, sustainably, and reliably...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Magazine round up | 15 November 2024
Magazine round up | 15 November 2024
15th November 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.182 0.287s - 192pq - 2rq
Subscribe Now