Thornton Bank offshore wind farm project, Belgium
Name and Location
Thornton Bank offshore wind farm project, North Sea, Belgium.
Client
C-Power, comprising THV Seawind, REpower Systems, ABB and the Port of Ostend.
Project Description
The Thornton Bank wind farm is situated about 30 km off the coast of Belgium in waters up to 30 m deep.
The first phase of the Thornton Bank (Thornton Bank 1) offshore wind farm comprises six 5 MW turbines built on gravity-based foundations and connected by 33 kV cables.
These are linked to the onshore high-voltage station through a 150 kV export cable, which is currently used at 33 kV with an onshore transformer to inject into the 36 kV grid.
Thornton Bank 2 consists of twenty-four 6 MW turbines installed on jacket foundations.
The third extension phase of Thornton Bank also consists of 24 wind turbines of the 6 MW class, installed on jacket foundations.
Thornton Bank 2 and 3 and the offshore transformer station are connected by means of 33 kV cables.
The offshore wind farm boasts an installed output of about 325 MW, capable of supplying an estimated 600 000 people with electricity a year.
Value
The project is valued at about €1.3-billion.
Eight commercial European banks, the European Investment Bank and the German and Danish export credit agencies provided an estimated €900-million in financing and venture capital.
Duration
Construction of Phase 1 started in May 2007 and was commissioned in 2009.
The construction work on Thornton Bank 2 started at the end of 2010 and the turbines were fully commissioned at the beginning of 2013.
The third phase of the project was officially inaugurated in September this year.
Latest Developments
The Thornton Bank offshore wind farm was officially inaugurated on September 17.
Key Contracts and Suppliers
None stated.
On Budget and on Time?
Not stated.
Contact Details for Project Information
C-Power, tel +32 59 79 79 80, fax +32 59 79 79 88 or email c-power@c-power.be.
Comments
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation