https://newsletter.en.creamermedia.com
Copper|Iron Ore|Mining|Projects|Products|Operations
Copper|Iron Ore|Mining|Projects|Products|Operations
copper|iron-ore|mining|projects|products|operations

Vale's iron-ore output falls in first quarter hurt by Brazil rains

16th April 2025

By: Reuters

  

Font size: - +

RIO DE JANEIRO/SAO PAULO - Brazilian miner Vale produced 67.7-million metric tons of iron ore in the first quarter of 2025, down 4.5% from a year earlier, the company said on Tuesday in its sales and output report.

One of the world's largest iron-ore producers, Vale said heavy rainfall impacted production in its Brazilian Northern mining complex.

The weaker first-quarter output had been expected, Vale said, and it reaffirmed its outlook to produce between 325-million tons and 335-million tons of iron ore in 2025, as it also began the ramp-up of mining projects VGR1 and Capanema.

Sales of iron ore rose 3.6% in the quarter year-on-year to 66.1-million tons, the report showed, with Vale attributing the increase to supply from inventories, while also noting it has been prioritizing medium-grade products given market conditions.

The average realized price of Vale's iron-ore fines was $90.80 per ton in the quarter ended in March, down almost 10% year-on-year and a 2.4% decline from the last quarter of 2024.

In a note to clients, Citi analysts said iron ore output and sales came mostly in line with expectations, but copper and nickel beat their estimates.

"We estimate very minor downgrades to consensus EBITDA estimates," analysts Alexander Hacking and Stefan Weskott wrote, adding they expect the stock to perform in line following the results.

Vale will release its first-quarter earnings on April 24.

Vale's copper production increased 11% in the quarter year-on-year to about 90 900 t, with the firm citing strong performance at the Voisey’s Bay mine in Canada and the Salobo and Sossego operations in Brazil. Copper sales grew 6.6% to about 81 900 t.

Nickel output rose about 11% year-on-year to around 43 900 t, mainly due to higher output at Onca Puma in Brazil and better performance at its Canadian assets, Vale said. It sold 38 900 t of nickel in the quarter, a 17.5% rise from a year earlier.

Edited by Reuters

Comments

Latest Multimedia

 

Showroom

WearCheck
WearCheck

Leading condition monitoring specialists, WearCheck, help boost machinery lifespan and reduce catastrophic component failure through the scientific...

VISIT SHOWROOM 
Alcohol Breathalysers
Alcohol Breathalysers

Supplier & Distributor of the Widest Range of Accurate & Easy-to-Use Alcohol Breathalysers

VISIT SHOWROOM 

Latest Multimedia

sponsored by

UP showcases mining VR centre
UP showcases mining VR centre
16th April 2025

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.108 0.195s - 172pq - 2rq
Subscribe Now