Weir Minerals’ turnkey solution increased grinding circuit capacity by 10%, delivering a payback in just 3 days
This article has been supplied.
MATSA is a modern Spanish mining company based in the north of the Iberian Pyrite Belt, a mining district that has been active for more than 2,500 years. Weir Minerals has been working with MATSA to optimise its minerals treatment plant’s primary and secondary grinding circuits.
“We have been working with MATSA for 12 years and our service team has built a solid partnership with them. We opened a service site close to MATSA and employed a full-time Service Engineer on site to provide adequate support,” states Seda Kahraman, Regional Process Engineer Manager for Weir Minerals. “Their success is our success, and working on this particular project was both very challenging and very rewarding. They needed to increase their grinding circuit capacity from 275 tonnes per hour (tph) to 307 tph, whilst reducing the quantity of ultrafines in the final overflow of the second hydrocyclone cluster.”
Antonio Gamiz - Plant Technical Director states: “To maximise our plant productivity we needed a Cavex hydrocyclone cluster that was specifically designed to our application. This was achieved without an extension of the plant area and with minimal capital expenditure.”
Weir Minerals took a holistic approach to this challenge by first creating a simulation of the entire primary and secondary grinding circuit. This enabled them to visualise how the process should be running, and the most appropriate way to deliver this.
Following the simulation, the best operating conditions were calculated to support the required capacity increase and elimination of slimes. This included the ball mills, mill liners and hydrocyclones. Using 3D laser scanner technology, the team at Weir Minerals developed a suitable layout for the equipment, including modification and steel structures.
“This truly was a turnkey solution; the team had to pull together all their smarts, capabilities and tools to ensure MATSA’s grinding capacity was raised, whilst simultaneously reducing the quantity of ultrafines from their overflow. We achieved this with a range of tools and techniques including engineer design, subcontract management, and manufacturing of steel. It’s fantastic working on these types of projects as we follow the entire process and witness the solutions come to life,” states Seda Kahraman.
To deliver the solutions MATSA required, Weir Minerals replaced the primary hydrocyclone cluster, as well as the spare parts on the secondary hydrocyclone cluster; redesigned the steel structure and walkways; installed new hydrocyclone feed pumps and piping configurations, installing and commissioning the entire project.
The modification to the steelwork and piping, as well as the assembly of the new three-way Cavex® 650CVX hydrocyclone cluster were completed in less than four days without any production interruptions. Upon analysing samples from various points in the grinding circuit, it was confirmed that the feed capacity had successfully increased to 300-307 tonnes per hour.
“In addition to the desired increase in grinding capacity, we also improved circulating load in the primary ball mill and restored the feed pressure to the Cavex hydrocyclones to 85kPa. We are thrilled that MATSA achieved payback in just three days due to the increase in production by 500 tonnes a day, and achieved additional revenue of €2,751 per hour. We strive for results like these for our customers every day”, concludes Seda Kahraman.
Comments
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation