Africa’s richest city needs R221bn to fix infrastructure
Johannesburg, billed as Africa’s richest city because of its concentration of businesses and millionaires, needs R221-billion to catch up on maintenance and overdue upgrades across its collapsing road, power and water networks.
The city council discussed the shortfall late last month and detailed it in documents seen by Bloomberg. It comes at a time when regular power outages — the result of distribution-network breakdowns — hit large swathes of Johannesburg. Officials leave potholes unattended for months and parts of the city had no water for as long as 11 days in March.
The work pileup “highlights significant risks to public safety, economic safety and the environment if not addressed,” the city said of the road network in the documents. “Ignoring the backlog could lead to deteriorating roads, unsafe bridges, flooding and increased accidents.”
Financial and political turmoil in recent years has beset the city of about 5 million people that’s had eight mayors since 2019 due to constantly shifting coalitions. While the African National Congress and Economic Freedom Fighters are the largest parties in the ruling coalition with 119 seats between them, they have installed a mayor from the Al-Jama-ah party, which has just three seats. There are 270 councilors in total.
That’s in contrast to the national government where the ANC, which lost its majority in May elections for the first time in three decades, has allied with the Democratic Alliance and a number of other parties to run the country. The EFF is in opposition.
Last month, Johannesburg’s council imposed above-inflation increases for utilities and rates and forced through a R2.5-billion loan from the Agence Francaise de Developpement despite initial objections from opposition parties.
The City of Johannesburg didn’t respond to multiple requests for comment.
The documents show that the city has missed its annual target for water-infrastructure investment every year since at least 2008 and that its electricity utility, City Power, has “urgent needs for upgrades and replacement to ensure network reliability and safety.”
A separate document, dated March 6, shows that the city is struggling with revenue collection from large customers, including government departments and companies, with R6.1-billion of payments more than 90 days overdue.
Comments
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation