https://newsletter.en.creamermedia.com
Copper|Exploration|PROJECT|Surface|Testing|Drilling
Copper|Exploration|PROJECT|Surface|Testing|Drilling
copper|exploration|project|surface|testing|drilling

Copper, nickel intersected at Tertiary’s Zambia project

14th April 2025

By: Tasneem Bulbulia

Deputy Editor Online

     

Font size: - +

Aim-listed Tertiary Minerals has announced the completion of an initial scout drilling programme of three diamond drill holes for a total length of about 554 m at the Mukai copper project, in Zambia.

Near-surface anomalous copper mineralisation has been intersected, as have near-surface, thick intervals of anomalous nickel mineralisation.

Two drill holes targeted the broader copper-in-soil anomaly and one hole tested the geology of the Tirosa basin. The remainder of the basin, large parts of the copper-in-soil anomaly and the nickel-in-soil anomalies are yet to be tested.

The project is under agreement with First Quantum Minerals (FQM), which is managing the exploration on the project during its due diligence period.

Mukai lies adjacent to FQM’s Trident project.

“The cost-effective surface sampling undertaken by Tertiary in 2023, along with its spatial position near to FQM’s Trident project, confirmed the Mukai project as a high priority drill target for FQM.

“The three drill holes targeted the broader copper-in-soil anomaly and intersected both near surface anomalous copper and nickel mineralisation. Two of the holes collared on the basin margin within the Lower Roan Subgroup siliclastic sediments and the footwall to the target units. The third hole was collared within the basin and in the hanging wall and drilled through the Upper Roan to Lower Roan (footwall) geology,” Tertiary MD Richard Belcher explains.

“Given the limited drilling completed to date, and with only one hole testing the target units and much of the soil anomaly untested, we believe there is still much potential upside to this project,” he highlights.

Tertiary is liaising with FQM on the next steps for exploration.

“FQM has reported that the drilling and other preparatory work completed reaches their minimum expenditure of $500 000 for year one as part of the 24-month due diligence period,” Belcher informs. 

Edited by Chanel de Bruyn
Creamer Media Senior Deputy Editor Online

Comments

Showroom

WearCheck
WearCheck

Leading condition monitoring specialists, WearCheck, help boost machinery lifespan and reduce catastrophic component failure through the scientific...

VISIT SHOWROOM 
Condra Cranes
Condra Cranes

ISO-certified Condra manufactures overhead cranes, portal cranes, cantilever cranes and crane components: hoists, drives, end-carriages, brakes and...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

UP showcases mining VR centre
UP showcases mining VR centre
16th April 2025

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.193 0.281s - 170pq - 2rq
Subscribe Now