https://newsletter.en.creamermedia.com
Africa|Construction|Design|Environment|Financial|Flow|Hydropower|Infrastructure|Lighting|Power|PROJECT|Projects|Flow|Infrastructure
Africa|Construction|Design|Environment|Financial|Flow|Hydropower|Infrastructure|Lighting|Power|PROJECT|Projects|Flow|Infrastructure
africa|construction|design|environment|financial|flow-company|hydropower|infrastructure|lighting|power|project|projects|flow-industry-term|infrastructure

Debt funders appointed for 15 MW Kenya hydropower project

Tembo Power has a portfolio of ten projects across Kenya, Burundi and the Democratic Republic of Congo

Tembo Power founder Raphael Khalifa

16th April 2020

By: Terence Creamer

Creamer Media Editor

     

Font size: - +

Africa-focused independent power producer Tembo Power, of Mauritius, has announced the appointment of two senior debt financiers – the Emerging Africa Infrastructure Fund (EAIF) and Finnfund – for its 15 MW Kaptis hydropower project in Kenya.

The $44-million run-of-river project is located near the town of Kakamega, in western Kenya, and is scheduled to enter into commercial operation in the third quarter of 2022.

South African asset manager Ninety One, which is an authorised agent for the Private Infrastructure Development Group’s EAIF, will act as mandated lead arranger for the financing of the project.

Debt financing of $30-million is required to advance Kaptis through the final design, planning and construction phases, with the project’s equity partners – Tembo Power, Metier and WK Power – to inject about $14-million into the construction of the plant.

Tembo Power founder Raphael Khalifa described the two lenders as major players in the African infrastructure sector and said their appointments represented a significant step towards the financial closing of the Kaptis project, scheduled for later this year.

Tembo Power is also in talks with the Kenya Power & Lighting Company to conclude a 20-year power purchase agreement based on a tariff of $0.082c/kWh. Other conditions precedent include a letter of support from Kenya’s Treasury and the securing of a generation licence.

Once fully operational, the hydropower plant is expected to produce at a yearly rate of 86 GWh, depending on rainfall and river flow rates.

Separately, Tembo Power is raising equity financing for a portfolio of ten projects, with a combined capacity of 186 MW, across Kenya, Burundi and the Democratic Republic of Congo.

Tembo Power is focusing on run-of-river opportunities, which are considered more environment-friendly than other hydropower technologies, as well as on medium- to high-head sites so as to limit dependence on river flow.

Edited by Creamer Media Reporter

Comments

Projects

Showroom

Immersive Technologies
Immersive Technologies

Immersive Technologies is the world's largest, proven and tested supplier of simulator training solutions to the global resources industry.

VISIT SHOWROOM 
John Deere (Pty) Ltd
John Deere (Pty) Ltd

In 1958 John Deere Construction made its first introduction to the industry with their model 64 bulldozer.

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.15 0.248s - 196pq - 2rq
Subscribe Now