https://newsletter.en.creamermedia.com
Energy|Exploration|Gas|Industrial|Iron Ore|Petroleum|PROJECT|Technology|Operations
Energy|Exploration|Gas|Industrial|Iron Ore|Petroleum|PROJECT|Technology|Operations
energy|exploration|gas|industrial|iron-ore|petroleum|project|technology|operations

Electric smelting furnace pilot plant, Australia

Image of electric arc firnace

Photo by ©Bloomberg

7th March 2025

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Electric smelting furnace (ESF) pilot plant.

Location
Kwinana Industrial Area, south of Perth, Australia.

Project Owner/s
NeoSmelt, a collaboration between steelmaker BlueScope, and iron-ore producers BHP and Rio Tinto. Australian petroleum exploration company Woodside Energy will join the consortium as an equal equity participant and energy supplier, subject to the finalising of commercial arrangements. The project remains open for collaboration with other parties that complement its objectives.

Project Description
The pilot plant aims to prove Pilbara iron-ore can be used to produce lower-carbon emissions molten iron using direct reduced iron (DRI)-ESF technology.

The pilot plant will produce 30 000 t/y to 40 000 t/y of molten iron. It will initially use natural gas to reduce iron-ore to DRI, but once operational, the project aims to use lower-carbon emissions hydrogen to reduce iron-ore.

Potential Job Creation
Not stated.

Net Present Value/Internal Rate of Return
Not stated.

Capital Expenditure
Not stated.

Planned Start/End Date
Subject to funding, the project expects a decision to enter feasibility studies in the second quarter of 2025 and is targeting a final investment decision for the pilot plant in 2026, with operations expected to start in 2028.

Latest Developments
None stated.

Key Contracts, Suppliers and Consultants
Not disclosed.

Contact Details for Project Information
Rio Tinto, Rachel Pupazzoni, cell +61 438 875 469 or email rachel.pupazzoni@riotinto.com.
BlueScope, Michael Reay, cell +61 437 862 472 or email michael.reay@bluescope.com.
BHP, Jimmy Clothier, cell +61 413 391 031 or email jimmy.clothier@bhp.com.
Woodside Energy, Christine Forster, cell +61 484 112 469 or email christine.forster@woodside.com.
 

Edited by Martin Zhuwakinyu
Creamer Media Senior Deputy Editor

Comments

Latest News

Finance Minister Enoch Godongwana
Budget may be tweaked further, Godongwana says
13th March 2025 By: Reuters

Showroom

ESAB showroom image
ESAB South Africa

ESAB South Arica, the leading supplier of high-end welding and cutting products to the Southern African industrial market is based in...

VISIT SHOWROOM 
Rentech
Rentech

Rentech provides renewable energy products and services to the local and selected African markets. Supplying inverters, lithium and lead-acid...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Magazine round up | 14 March 2025
Magazine round up | 14 March 2025
14th March 2025

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.205 0.356s - 174pq - 2rq
Subscribe Now