https://newsletter.en.creamermedia.com
Mining|PROJECT|Resources
Mining|PROJECT|Resources
mining|project|resources

Endeavor restart to cost A$23.7m

Image shows stacked zinc bars

Photo by Bloomberg

16th October 2023

By: Esmarie Iannucci

Creamer Media Senior Deputy Editor: Australasia

     

Font size: - +

PERTH (miningweekly.com) – A mine restart study for the Endeavor silver/zinc/lead mine, in New South Wales, estimates that the project will require a capital investment of A$23.7-million and could support an initial ten-year mine life with significant growth potential.

ASX-listed Polymetals Resources on Monday reported that the restart study estimated the project could produce its first concentrate by the second half of 2024, producing 210 000 t of payable zinc, 62 000 t of payable lead and 9.75-million ounces of payable silver.

The study estimated that the project could produce revenues of A$1.4-billion and earnings before interest, taxes, depreciation and amortisation of A$400-million, with life-of-mine free cash flows estimated at A$323-million.

The study estimated a pre-tax net present value of A$201-million and an internal rate of return of 91%.

“The delivery of the Endeavor mine restart study is the culmination of an immense body of work completed to a high level of confidence that can support a positive investment decision,” said Polymetals executive chairperson Dave Sproule.

“Bringing silver back into the revenue stream via our reset of the historic 100% silver streaming royalty has unlocked significant value at the Endeavor mine. The mine restart study shows a mining operation that makes swift payback of capital because of high operating margins and the restart nature of activity.

“We are well advanced in our negotiations to replace the Rehabilitation Bond which will complete Polymetals' acquisition of the project, as well as a finance facility to ensure coverage for peak negative cash drawdown,” said Sproule.

The results of the mine restart study have allowed Polymetals to declare an ore reserve of 5.6-million tonnes at Endeavor.

Edited by Creamer Media Reporter

Comments

Research Reports

Latest Multimedia

Photo of Martin Creamer
On-The-Air (26/09/2025)
26th September 2025 By: Martin Creamer
 

Showroom

SoToxaTM - Mobile test system
Alco-Safe

Developed to exceed the latest EN 15964 standards for police breathalysers proving that it will remain accurate and reliable for many years to come.

VISIT SHOWROOM 
Multotec
Multotec

Multotec, recognised industry leaders in metallurgy and process engineering help mining houses across the world process minerals more efficiently,...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Magazine round up | 26 September 2025
Magazine round up | 26 September 2025
26th September 2025

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.058 0.148s - 184pq - 2rq
Subscribe Now