Imboulou hydroelectric power plant, Republic of the Congo
Name and Location
Imboulou hydroelectric power plant, Republic of the Congo.
Project Description
The project involved the construction of a hydroelectric power plant with an installed capacity of 120 MW on the Lefini river, some 215 km from Brazzaville. The plant consists of a dam with four vertical Kaplan turbines, two bottom outlets and the spillway, as well as a 270-m-long earth dam.
The facility is expected to generate 876-million kilowatt hours a year and allow the country to reduce energy imports from its larger neighbour, the Democratic Republic of Congo.
Value
An amount of $377-million, of which 85% was in the form of soft loans from China.
Duration
Construction started in 2005 and the plant was officially inaugurated in early May 2011.
Client
Délégation Générale des Grands Travaux (DGGT).
Key Contracts and Suppliers
Sinohydro (construction); China National Machinery & Equipment Import & Export Corporation (general contractor); and Fichtner (construction supervision and quality control for the power station, storage dam and access road).
Latest Developments
None stated.
On Budget and on Time?
The project was delivered on schedule and within budget.
Contact Details for Project Information
DGGT, Jean Jacques Bouya, tel +242 81 47 13 or fax +242 81 40 21.
Fichtner MD Roland Pröger, tel +49 7 11 899 5277 or email roland.proeger@fwt.fichtner.de.
Comments
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation