https://newsletter.en.creamermedia.com

Company secures refurbishment contract

30th January 2015

By: Leandi Kolver

Creamer Media Deputy Editor

  

Font size: - +

Total technology solutions provider Tenova Mining & Minerals’ client support services division secured the supply and installation contract in November last year for the refurbishment of a Redler chain elevator for a brewery in Johannesburg.

The contract was awarded to the company on the back of the successful supply and installation of a Redler chain elevator at the same brewery in December 2013.

Tenova Mining & Minerals client support services GM Paul Davies explains that the Redler chain elevators used by the brewery, which were installed in 1991 by bulk handling equipment supplier Tenova Takraf Africa – then known as Bateman Engineered Technologies prior to the merger with Tenova Mining & Minerals in 2012 – are used to convey coal at a rate of 41.5 t/h. The coal is conveyed from the brewery’s intake hoppers to the top of its boiler house, from where it is transferred to the over boiler Redler conveyors and into the day hoppers, providing steam for the brewing and distilling process.

Tenova Mining & Minerals field service technician Gerhard Vermaak says an inspection by Tenova Mining & Minerals client support services and the brewery determined that the casings of the No 1 elevator had to be replaced. “The increases in spillages from the worn casings were a main concern, owing to the downtime required to clean and carry out repairs.”

He notes that the contract covered the removal of the worn parts and the supply and installation of the new casings and chain. Site installation did not interrupt production, owing to the twin operating system that is in place.

He tells Engineering News that the elevator’s casings were upgraded from mild steel to stainless steel to help combat against corrosion, as coal can be a corrosive material, particularly when wet.

“The replacement has significantly extended the life of the machine at a significantly lower cost than that of installing a new system,” he notes, adding that the contract was completed in three months – from signing to completion – with installation taking two weeks.

Tenova Takraf Africa has supplied several Redler chain elevators and conveyors to breweries in South Africa and Botswana, where they are used to convey coal to boiler houses for steam production, as well as barley and malt for brewing.

Edited by Samantha Herbst
Creamer Media Deputy Editor

Comments

Showroom

Condra Cranes
Condra Cranes

ISO-certified Condra manufactures overhead cranes, portal cranes, cantilever cranes and crane components: hoists, drives, end-carriages, brakes and...

VISIT SHOWROOM 
M and J Mining
M and J Mining

M and J Mining are leading suppliers of physical support systems as used by the underground mining industry. Our selection of products are not...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Photo of Martin Creamer
On-The-Air (15/11/2024)
15th November 2024 By: Martin Creamer

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.21 0.35s - 309pq - 2rq
Subscribe Now