https://newsletter.en.creamermedia.com
Cable|Construction|Energy|Engineering|Gas|Hydropower|Power|PROJECT|Projects|Roads|Service|Solar|Storage|Surface|System|Technology|Tunnelling|Turbines|Underground|Water|Tunnelling|Infrastructure|Turbines
Cable|Construction|Energy|Engineering|Gas|Hydropower|Power|PROJECT|Projects|Roads|Service|Solar|Storage|Surface|System|Technology|Tunnelling|Turbines|Underground|Water|Tunnelling|Infrastructure|Turbines
cable|construction|energy|engineering|gas|hydropower|power|project|projects|roads|service|solar|storage|surface|system|technology|tunnelling-company|turbines-company|underground|water|tunnelling|infrastructure|turbines-person

SA company receives multibillion-dollar contract

SO MUCH DAM WATER The Snowy 2.0 project with reuse water through a pumping system to keep the grid running

SO MUCH DAM WATER The Snowy 2.0 project with reuse water through a pumping system to keep the grid running

15th February 2019

     

Font size: - +

Construction and engineering company Clough, a wholly owned subsidiary of South African engineering company Murray & Roberts – and part of the Clough Salini Impregilo Joint Venture (JV) – has been selected as the preferred tenderer for the multibillion Australian dollar civil works for the Australian hydro project Snowy 2.0.

The JV, known as Future Generation, tendered on the civil works for the Snowy 2.0 project which is estimated to be worth A$4-billion.

Snowy 2.0 will link two existing Snowy Scheme dams, the upper Tantangara and lower Talbingo, through underground tunnels to depths of up to one kilometer and construct an underground power station with pumping capabilities.

Hydropower will be generated by falling water spinning Snowy 2.0’s giant reversible turbines, which can also pump water in the opposite direction. Snowy 2.0’s pumping capabilities work in a ‘closed’ system – water is recycled at Tantangara and Talbingo so that the same water can be used to generate power more than once, making the most of available water. Snowy Hydro already has pumped-hydro capabilities at the Tumut 3 power station – it is proven technology used globally.

The Snowy 2.0 project will also involve surface works in several locations including at the intake-outlet structures, surge shaft, cable and ventilation portal sites. A number of supporting works will also be required such as establishing or upgrading access tracks and roads and electricity connections to construction sites.

Snowy 2.0 will add 2 000 MW of energy generation and provide 175 hours of energy storage for the national electricity market, enough to ensure the stability and reliability of the system during prolonged weather events, such as wind or solar droughts. Snowy Hydro already plays a critical role in ensuring system stability at times of peak demand, and Snowy 2.0 will enhance this existing capability.

“Being chosen as preferred bidder for this multiyear infrastructure project, confirms the group’s ability to secure projects in complementary markets,” comments Murray & Roberts Group CEO Henry Laas. He says that the group’s strategy to extend the group’s service offering to complementary markets with active investment programmes is of critical importance, considering the current lack of new project opportunities in the Australasian liquid natural gas sector.

“We are extremely pleased with the award of this iconic project by Snowy Hydro,” says Clough CEO and MD Peter Bennett. Currently celebrating its hundredth year of operation, Clough is an Australian-founded engineering and construction company with a proven history of delivering world-class projects and critical infrastructure in Australia and internationally. He adds that, “Clough’s local expertise will be one of the key elements for the successful delivery of Snowy 2.0 and, combined with Snowy’s legacy, we bring together 170 years of Australian expertise”.

Further, Salini Impregilo are world leaders in hydropower and tunnelling and, combined with Clough, create an unrivalled partnership capability that will deliver the project for the benefit of the Australian community.

“We are excited to be selected by Snowy Hydro to deliver this critical national infrastructure,” concludes Bennett.

Edited by Zandile Mavuso
Creamer Media Senior Deputy Editor: Features

Comments

Showroom

SMS group
SMS group

At SMS group, we have made it our mission to create a carbon-neutral and sustainable metals industry.

VISIT SHOWROOM 
BOVA Safety Wear
BOVA Safety Wear

BOVA cemented their reputation in Africa by delivering high quality engineering through their range of safety footwear. 21 years after producing...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Photo of Martin Creamer
On-The-Air (08/11/2024)
8th November 2024 By: Martin Creamer
Magazine round up | 08 November 2024
Magazine round up | 08 November 2024
8th November 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.166 0.26s - 187pq - 2rq
Subscribe Now