https://newsletter.en.creamermedia.com
Copper|Exploration|Mining|PROJECT|Resources|Waste|Drilling|Waste
Copper|Exploration|Mining|PROJECT|Resources|Waste|Drilling|Waste
copper|exploration|mining|project|resources|waste-company|drilling|waste

Osisko defers Gaspé PEA, reports significant resource hike

15th November 2024

By: Creamer Media Reporter

     

Font size: - +

Exploration and development company Osisko Metals has announced an updated mineral resource estimate (MRE) for the Gaspé copper project, near Murdochville, in Quebec.

The updated estimate includes pit-constrained resources comprising 824-million tonnes grading 0.34% copper-equivalent of indicated category and 670-million tonnes grading 0.38% copper-equivalent of inferred category.

This represents a 53% increase in copper-equivalent metal content over the previously reported indicated resource and a 100-fold increase in copper-equivalent metal content in inferred resources.

Osisko states that, at 4.91-billion pounds (2.23-million tonnes) of contained copper, as well as significant molybdenum (274-million pounds) and silver (46.0-million ounces), the latest Gaspé copper in-pit indicated resource hosts the largest undeveloped copper/molybdenum deposit in eastern North America, exclusive of inferred resources.

“The overall resource has increased dramatically since last spring’s MRE as a result of new geological modelling and extending the modelled Whittle pit boundaries towards Needle Mountain to the south,” says CEO and chairperson Robert Wares.

A minimum 70 000 m drill programme is now planned for 2025, with the objective of converting the bulk of the current inferred resource to the indicated category.

There is also potential for converting currently categorised in-pit waste rock to mineralised material with this drill programme, which would further grow the in-pit resource while reducing the strip ratio.

“This MRE represents a much larger resource than was estimated previously, presenting the potential for a bulk tonnage mining operation with significantly higher throughput,” says Wares.

Given the new resource milestone, Osisko has elected to defer the preliminary economic assessment (PEA), originally slated for release in the first quarter of 2025, to a later date, until additional new drilling is completed.

Ongoing studies will focus on a larger-scale mine plan and relocation of the mill complex away from the current site.

“We are proud to be leading the Gaspé copper project, which is shaping up to be a major Canadian copper/molybdenum development project located in one of the world’s safest mining jurisdictions. This important asset has the potential to become a core component of Québec’s critical mineral development strategy that aims to provide essential metals for global decarbonisation initiatives,” says Wares.

Edited by Creamer Media Reporter

Comments

Showroom

Aqs image
AQS Liquid Transfer

AxFlow AQS Liquid Transfer (Pty) Ltd is an Importer and Distributor of Pumps in Southern Africa

VISIT SHOWROOM 
Environmental Assurance (Pty) Ltd.
Environmental Assurance (Pty) Ltd.

ENVASS is a customer and solutions-driven environmental consultancy with established divisions, serviced by highly qualified and experienced...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Photo of Martin Creamer
On-The-Air (15/11/2024)
15th November 2024 By: Martin Creamer

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.084 0.189s - 192pq - 2rq
Subscribe Now