https://newsletter.en.creamermedia.com
Construction|Copper|Exploration|Mining|Power|PROJECT|Projects|Resources|Surface|Drilling
Construction|Copper|Exploration|Mining|Power|PROJECT|Projects|Resources|Surface|Drilling
construction|copper|exploration|mining|power|project|projects|resources|surface|drilling

Patriot secures high-grade Sugarloaf copper deposit in Zambia

22nd May 2025

By: Creamer Media Reporter

     

Font size: - +

ASX-listed Patriot Resources on Thursday announced the acquisition of the high-grade Sugarloaf copper deposit, in the Mumbwa district of Zambia.

The project has an exploration target of between 1.6-million and 2.5-million tonnes at grades ranging from 2.0% to 2.5% total copper, for an estimated 32 000 t to 62 500 t of contained copper, based on historical drilling data.

The copper deposit is situated about 4.4 km south-east of Sinomine’s Kitumba copper deposit and under-construction smelter, which Patriot aims to leverage for ore processing.

“Upon the completion of this acquisition, we will have a portfolio of copper projects ranging from near-term, high-grade production to large-scale blue sky exploration – all within the Mumbwa high-grade copper district of Zambia,” said Patriot chairperson Hugh Warner.

“It is Patriot’s intention to synchronise Sugarloaf’s development timetable with Sinomine’s development of their Kitumba process plant and smelter, which is expected to come on line in late 2026, in order to be able to supply our ore to that facility for processing,” Warner added. 

“We believe that with Sinomine’s Kitumba mine and smelter coming on line, a stranded deposit like Sugarloaf quickly becomes attractive.”

Sinomine chairperson Pingwei Wang welcomed the announcement, stating: “Congratulations to the Patriot team and we look forward to processing the Sugarloaf ore at our state-of-the-art Kitumba smelter.”

The Sugarloaf deposit is hosted in a geological setting similar to that of the Kitumba copper deposit and features near-surface mineralisation amenable to openpit mining. The orebody, exposed by artisanal mining, has been drilled with 35 historical holes covering 11 904 m of diamond core. It also lies less than 500 m from the Zambia power grid.

Terms of the acquisition include a $10 000 deposit and 30-day due diligence period, a $1-million payment within 90 days, and a deferred payment of either $500 000 by December 31, 2025, or $1-million from future cash flows.

Patriot says further exploration could unlock additional value, with several copper occurrences identified within the broader licence area. The project is covered by a mining licence valid until 2033.

Edited by Creamer Media Reporter

Comments

 

Showroom

Weir
Weir

Weir is a global leader in mining technology. We recognise that our planet’s future depends on the transition to renewable energy, and that...

VISIT SHOWROOM 
Actom
Actom

Your one-stop global energy-solution partner

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Magazine round up | 23 May 2025
Magazine round up | 23 May 2025
23rd May 2025

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.193 0.281s - 170pq - 2rq
Subscribe Now