https://newsletter.en.creamermedia.com
Contractor|Design|Financial|PROJECT|Sanitation|SECURITY|Service|System|Water
Contractor|Design|Financial|PROJECT|Sanitation|SECURITY|Service|System|Water
contractor|design|financial|project|sanitation|security|service|system|water

R2.3-billion contract for BRVAS approved

20th January 2023

By: Leah Shelene Asaram

Features Reporter

     

Font size: - +

The City of Cape Town Council approved the R2.3-billion Water Supply Agreement (WSA) with the Department of Water and Sanitation (DWS) on October 27, 2022 for the Berg River to Voëlvlei Augmentation Scheme (BRVAS).

The BRVAS, implemented by the DWS and the Trans-Caledon Tunnel Authority, enables the abstraction of surplus winter water from a proposed low level diversion weir across the Berg River and the pumped delivery of that water into Voëlvlei dam.

The Western Cape Reconciliation Strategy Study, developed by the DWS, identified the need to augment the Western Cape water supply system. A detailed feasibility study found that the BRVAS would be the most cost-effective solution, producing about 63-million additional litres of water a day and increasing the yield by about 5.22% once completed.

Acting Water and Sanitation MMC Siseko Mbandezi says the City of Cape Town must conclude a 20-year WSA with the DWS, which was stated in the contract.

The contract, which incurs a financial obligation proposes to boost supply to the City of Cape Town by about 40-million litres of drinking water a day from mid-2025.

Mbandezi says the BRVAS is an important component of the Cape Town City Water Strategy to help ensure long-term water security to navigate future climate shocks and droughts.

“The BRVAS project involves the pumped abstraction of surplus winter water from the Berg River once the ecological water requirements of the River and the estuary have been met.”

The scheme consists of the pumped abstraction of water in winter from the Berg River to increase the yield of the Voëlvlei dam by about 23-million cubic metres a year; a low-level weir and pumpstation to be located at the Lorelei site on the Berg River; and a 6.3-km-long pipeline to deliver the water into the dam.

The pipeline will be designed for reverse operation during summer so that releases can be made from the Voëlvlei dam to the downstream users and the ecological water requirements of the estuary can be met.

Once finance from the National Treasury has been secured, a service provider or contractor will be appointed. The detailed design of the scheme must still be undertaken, states Mbandezi.

The BRVAS is a critical component of the City of Cape Town’s water strategy, which aims to increase available supply to the City by adding 300 Mℓ/d of water by 2030.

Other water augmentation schemes that are being implemented as part of the water strategy, and which will diversify supply, are groundwater development, water reuse and desalination, Mbandezi concludes.

Edited by Zandile Mavuso
Creamer Media Senior Deputy Editor: Features

Comments

Showroom

Rio-Carb
Rio-Carb

Our Easy Access Chute concept was developed to reduce the risks related to liner maintenance. Currently, replacing wear liners require that...

VISIT SHOWROOM 
John Deere (Pty) Ltd
John Deere (Pty) Ltd

In 1958 John Deere Construction made its first introduction to the industry with their model 64 bulldozer.

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Photo of Martin Creamer
On-The-Air (15/11/2024)
15th November 2024 By: Martin Creamer

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.218 0.32s - 189pq - 2rq
Subscribe Now