Saldanha Iron Ore Terminal loads over 15Mt of ore despite restrictions
Despite operating under Covid-19 restrictions, Transnet Port Terminals’ (TPT’s) Saldanha Iron Ore Terminal (IOT) loaded 15.6-million tonnes in the first four months of the 2020/21 financial year, meeting 76% of its contractual obligations.
During the same period last year, and using a full complement of gangs and two loaders, the terminal loaded 18.5-million tonnes of ore.
Further, during the week of June 29 to July 5, the iron-ore terminal loaded 1.1-million tonnes, beating its target of 967 000 t and setting an operating norm of 8 847 t an hour.
The terminal also faced weather challenges during this time, which TPT operations for Cape channel GM Louis du Toit says resulted in 182 hours of load time being lost between April and July because of heavy storms and winds which brought the terminal to a halt.
Had it not been for the adverse weather, Du Toit believes the terminal would have been able to load another 1.4-million tonnes of ore.
“We have received compliments from our customers who have indicated that TPT’s iron-ore terminal is one of very few that has managed to operate at this level during the lockdown restrictions. As of the start of August, the terminal is fully operational while still adhering to the Covid-19 regulations,” says Du Toit.
In the overall economy of South Africa, the Saldanha IOT plays an important role, with the Minerals Council South Africa’s 2019 Facts and Figures Pocketbook showing that the country mined 70.5-million tonnes of iron-ore in 2019.
Of this, 91% was exported with total nominal sales earning R71.4-billion, and the majority of this ore was exported through the Saldanha facility which has a capacity of 60-million tonnes a year.
Comments
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation