https://newsletter.en.creamermedia.com
Construction|Energy|Power|PROJECT|Renewable Energy|Renewable-Energy|Solar|Storage
Construction|Energy|Power|PROJECT|Renewable Energy|Renewable-Energy|Solar|Storage
construction|energy|power|project|renewable-energy|renewable-energy-company|solar|storage

Sierra Pinta battery energy storage project, US

Image of battery energy storage system

23rd August 2024

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Sierra Pinta battery energy storage project.

Location
Adjacent to Leeward Renewable Energy’s 179 MW White Wing Ranch solar project currently under construction in Yuma County, Arizona, in the US.

Project Owner/s
Leeward Renewable Energy.

Project Description
Sierra Pinta is a standalone 112.5 MW project, which will have a storage capacity of 450 MWh of clean power that can be dispatched during peak load times to meet demand.

This storage capacity is equivalent to the energy needed to power more than 90 100 US homes for four hours.

Potential Job Creation
The project is expected to create about 98 well-paying union jobs during peak construction.

Capital Expenditure
Not stated.

Planned Start/End Date
Construction is expected to start in September 2024 and the project is expected to be operational in the first half of 2025.

Latest Developments
None stated.

Key Contracts, Suppliers and Consultants
None stated.

Contact Details for Project Information
Leeward, tel +1 214 515 1100 or email info@leewardenergy.com.
 

Edited by Martin Zhuwakinyu
Creamer Media Senior Deputy Editor

Comments

Projects

Image of wind farm with sun in the background
Lålax Wind Farm, Finland
Updated 6 hours ago By: Sheila Barradas

Showroom

Alco-Safe
Alco-Safe

Developed to exceed the latest EN 15964 standards for police breathalysers proving that it will remain accurate and reliable for many years to come.

VISIT SHOWROOM 
Flameblock
Flameblock

FlameBlock is a proudly South African company that engineers, manufactures and supplies fire intumescent and retardant products to the fire...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Photo of Martin Creamer
On-The-Air (15/11/2024)
15th November 2024 By: Martin Creamer

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.1 0.262s - 194pq - 2rq
Subscribe Now