https://newsletter.en.creamermedia.com
Africa|Coal|Construction|Energy|Financial|Gas|Infrastructure|Power|PROJECT|Renewable Energy|Renewable-Energy|Resources|Solar|Infrastructure|Operations
Africa|Coal|Construction|Energy|Financial|Gas|Infrastructure|Power|PROJECT|Renewable Energy|Renewable-Energy|Resources|Solar|Infrastructure|Operations
africa|coal|construction|energy|financial|gas|infrastructure|power|project|renewable-energy|renewable-energy-company|resources|solar|infrastructure|operations

Ummbila Emoyeni wind energy facility, South Africa

Image of wind turbines at dusk

7th April 2023

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Ummbila Emoyeni wind energy facility.

Location
Mpumalanga, South Africa.

Project Owner/s
Coal producer Seriti Resources and its renewable-energy subsidiary Seriti Green.

Project Description
Ummbila Emoyeni has been designated as a Strategic Integrated Project by the Department of Public Works and Infrastructure.

The initial 155 MW wind energy facility is the first phase of a larger, almost 900 MW renewable-energy cluster, which comprises 750 MW of wind energy facilities and 150 MW of solar photovoltaic plants. Once built, the wind farm will transform more than 75% of the energy consumption from Seriti’s existing coal operations into renewable energy while helping to mitigate its Scope 1 and 2 greenhouse-gas emissions.

Potential Job Creation
Not stated.

Capital Expenditure
R4-billion.

Planned Start/End Date
Concluding the power purchase agreement and meeting all the conditions necessary to start construction, which includes reaching financial close on the project, are expected to be completed by the second quarter of 2023. The power supply is expected to come on line in 2025.

Latest Developments
None stated.

Key Contracts, Suppliers and Consultants
None stated.

Contact Details for Project Information
Seriti, tel +27 11 047 7000 or email info@seritiza.com.

Edited by Martin Zhuwakinyu
Creamer Media Senior Deputy Editor

Article Enquiry

Email Article

Save Article

To advertise email advertising@creamermedia.co.za or click here

Comments

Latest Multimedia

Photo of Martin Creamer
On-The-Air (12/12/2025)
12th December 2025 By: Martin Creamer

Showroom

Stewarts & Lloyds
Stewarts & Lloyds

Stewarts & Lloyds is a leading steel, tube, and engineering product supplier in South Africa.

VISIT SHOWROOM 
ATI Systems
ATI Systems

ATI systems comprises five divisions: electrical assemblies, drives and controls, feedback sensors, enclosures, and strip guiding.

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Magazine round up | 10 December 2025
Magazine round up | 12 December 2025
12th December 2025

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







301

sq:0.388 0.576s - 289pq - 2rq
Subscribe Now