https://newsletter.en.creamermedia.com
Copper|Iron Ore|Mining|PROJECT|Projects|Underground
Copper|Iron Ore|Mining|PROJECT|Projects|Underground
copper|iron-ore|mining|project|projects|underground

Vale posts highest quarterly iron-ore output since 2018

16th October 2024

By: Reuters

  

Font size: - +

RIO DE JANEIRO/SAO PAULO - Brazilian miner Vale reported on Tuesday a 5.5% increase in its third-quarter iron-ore production compared to a year earlier, reaching the highest level in almost six years.

The company, one of the world's top iron-ore suppliers, reported output of 91-million metric tons in the three months ended September 30, it said in a securities filing.

The volume of iron ore produced reached the highest level in a three-month period since the final quarter of 2018, powered by improved performance at a trio of Brazilian mining projects - S11D, Itabira and Brucutu - according to the company.

Last month, the firm raised its 2024 forecast for iron-ore output to between 323-million and 330-million tons after a stronger-than-expected first half.

Iron ore sales during the third quarter rose 1.6% from a year earlier to 81.8-million tons, mostly due to an increase in pellet shipments.

RBC Capital Markets analysts said Vale's production figures were above expectations across the entire portfolio and the miner was on track to achieve its full-year guidance.

Although sales volumes lagged production, the company said inventory build at the iron ore division is expected to reduce this quarter. RBC analysts said that should translate into an upgrade of market estimates for 2024 core earnings.

The average realized price of Vale's iron-ore fines was about $91 per ton in the quarter, down nearly 14% year-on-year, and 7.7% lower than the second quarter.

Vale noted that due to price increases and portfolio adjustments, its realized prices declined almost $5 per ton less than market prices during the quarter.

BASE METALS

Vale's copper production increased some 5% from a year earlier to reach 85 900 t in the third quarter, the miner said, adding that all of its copper projects showed an improvement.

The company's nickel output was also up, by almost 12% year-on-year to total 47 100 t, due to stronger performance at its Sudbury project as well as the ramp-up of Voisey's Bay underground mines, both in Canada.

Vale shipped 75 200 t of copper in the quarter, up about 2% year-on-year, while it sold 40 700 t of nickel, nearly 4% more than the same period last year.

Edited by Reuters

Comments

 

Showroom

Weir
Weir

Weir is a global leader in mining technology. We recognise that our planet’s future depends on the transition to renewable energy, and that...

VISIT SHOWROOM 
AutoX
AutoX

We are dedicated to business excellence and innovation.

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Magazine round up | 13 December 2024
Magazine round up | 13 December 2024
13th December 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.357 0.463s - 190pq - 2rq
Subscribe Now