https://newsletter.en.creamermedia.com
Construction|Electrical|Infrastructure|Installation|Sanitation|Service|Services|Water|Maintenance|Infrastructure
Construction|Electrical|Infrastructure|Installation|Sanitation|Service|Services|Water|Maintenance|Infrastructure
construction|electrical|infrastructure|installation|sanitation|service|services|water|maintenance|infrastructure

City of Cape Town calls for public comment on proposed wastewater treatment facilities operator appointments

19th May 2025

By: Natasha Odendaal

Creamer Media Senior Deputy Editor

     

Font size: - +

The City of Cape Town’s Water and Sanitation Directorate has invited comment on a proposal to appoint external service providers for the operation and maintenance of four wastewater-related facilities.

This includes three existing wastewater treatment works (WWTWs), namely Borcherds Quarry faecal sludge management, the Fisantekraal WWTW and the Zandvliet WWTW, as well as the new Managed Aquifer Recharge (MAR) facility at the Cape Flats WWTW.

The construction of a new MAR facility at the Cape Flats WWTW is under way, with civil works completed and the mechanical and electrical installation phase having started.

“The City of Cape Town remains the designated wastewater services provider and retains ownership of its municipal wastewater infrastructure, regardless of any collaboration with external service providers,” said City of Cape Town Water and Sanitation MMC Councillor Zahid Badroodien.

“However, the unique technical nature of the new MAR facility and the drive to introduce more advanced and specialised technologies, make it potentially more effective and efficient to contract experienced external operators for this function.”

The move aims to support the implementation of innovative technologies that can enhance service delivery and forms part of the city’s broader strategy to explore alternative service delivery models that enhance capacity and service quality.

The city’s Water and Sanitation Directorate currently owns and manages 26 WWTWs across Cape Town.

The city, which already partners with external service providers in other city service delivery areas, is currently undertaking a feasibility study on the proposed external service delivery mechanisms for the four facilities.

The deadline for public comment is June 25.

“Public input is vital and will inform the completion of the feasibility study. Once finalised, the report will be made available again for public comment before being submitted to council for consideration,” Badroodien concluded.

Edited by Creamer Media Reporter

Comments

Showroom

Rentech
Rentech

Rentech provides renewable energy products and services to the local and selected African markets. Supplying inverters, lithium and lead-acid...

VISIT SHOWROOM 
Condra Cranes
Condra Cranes

ISO-certified Condra manufactures overhead cranes, portal cranes, cantilever cranes and crane components: hoists, drives, end-carriages, brakes and...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Photo of Martin Creamer
On-The-Air (16/05/2025)
16th May 2025 By: Martin Creamer

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.122 0.212s - 171pq - 2rq
Subscribe Now