https://newsletter.en.creamermedia.com

Eastplats secures financing deal for Crocodile River Mine retreatment project

16th March 2018

By: Megan van Wyngaardt

Creamer Media Contributing Editor Online

     

Font size: - +

Dual-listed Eastern Platinum (Eastplats) and its subsidiary Barplats Mines have entered into an agreement with Union Goal Offshore Solution for the construction, mining and processing of the tailings resource, and the subsequent offtake of chrome concentrate from the Barplats Zandfontein Upper Group 2 tailings facility located at the Crocodile River mine, in South Africa.

Union Goal will finance and supply Barplats with the chrome processing circuit, related technology and knowhow, while Barplats would develop and operate the retreatment project.

The chrome circuit is designed to improve on recoveries of chrome concentrate compared with traditional technology. This could expand available resources for mining and processing.

The estimated capital requirements for Barplats are R164-million, which are expected to be funded from cash on hand, a R42.2-million upfront project payment from Union Goal and revenue from the retreatment project. The parties have presourced equipment and the construction phase is estimated to take seven months to complete.

Eastplats anticipates the retreatment project to result in revenue producing operations, through offtake of the chrome concentrates produced to Union Goal, when production starts this year.

Barplats would recover the retreatment project capital from Union Goal during operations at a rate of R25/t run-of-mine (RoM). All chrome concentrate would then be delivered to Union Goal from the retreatment project based on full cost recovery from Union Goal of all operation costs for the mining, processing, deposition and logistics.

Further, Union Goal would pay Barplats fees of R31.17/t RoM and defer payment terms for the chrome circuit of up to 33 months subject to a Barplats put and Union Goal call option for the repurchase of the chrome circuit by Union Goal in the event that either party is not satisfied with the agreed pricing for the chrome circuit once its operational capacity is established.

Eastplats CEO Diana Hu said the company was pleased to come to an agreement with Union Goal and begin construction immediately on the chrome recovery project, which would again establish Barplats as an operator.

Union Goal's business partners include major direct mine operators and traders of chrome ores and concentrates.

Union Goal also deals directly with downstream consumers through trading, direct and technological investments into ferrochrome producers and has other interests directly with the stainless steel industry.

Edited by Chanel de Bruyn
Creamer Media Senior Deputy Editor Online

Comments

Showroom

Aqs image
AQS Liquid Transfer

AxFlow AQS Liquid Transfer (Pty) Ltd is an Importer and Distributor of Pumps in Southern Africa

VISIT SHOWROOM 
Weir
Weir

Weir Minerals Europe, Middle East and Africa is a global supplier of excellent minerals solutions, including pumps, valves, hydrocyclones,...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Photo of Martin Creamer
On-The-Air (15/11/2024)
15th November 2024 By: Martin Creamer

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:6.138 6.243s - 170pq - 2rq
Subscribe Now