https://newsletter.en.creamermedia.com
Civils|Construction|Infrastructure|Mining|PROJECT|Resources|transport|Equipment|Infrastructure
Civils|Construction|Infrastructure|Mining|PROJECT|Resources|transport|Equipment|Infrastructure
civils|construction|infrastructure|mining|project|resources|transport|equipment|infrastructure

Image kicks off preliminary works at WA mineral sands project

11th June 2024

By: Mariaan Webb

Creamer Media Senior Deputy Editor Online

     

Font size: - +

ASX-listed Image Resources has started minor, or preliminary works, activities at its Atlas mineral sands project, north of Perth in Western Australia.

Preliminary works include the construction of the Atlas accommodation camp and deconstruction of the wet concentration plant (WCP) at Boonanarring in preparation for transport to Atlas.

The camp is being constructed on Image-owned private land, under an approved development application with the local shire. Deconstruction of the Boonanarring WCP and associated equipment is scheduled to start this month.

On ground construction of civils, the erection of processing equipment, mining box cut and supporting infrastructure are scheduled to start in the third quarter, following permitting approvals.

“We continue to advance pre-development activities for Atlas, and it is gratifying to be able to see the light at the end of the tunnel leading to the commencement of on-ground construction activities.

“We have an aggressive construction schedule with ambitions for first HMC production late in the fourth quarter 2024 or early first quarter 2025, leading to first revenue in the first quarter of 2025,” said MD and CEO Patrick Mutz.  

Edited by Creamer Media Reporter

Comments

Showroom

John Ratcliffe
John Ratcliffe

At John Ratcliffe, we are aftermarket specialists for heavy-duty on and off-road vehicles. We engineer and retrofit advanced safety systems, engine...

VISIT SHOWROOM 
WearCheck
WearCheck

Leading condition monitoring specialists, WearCheck, help boost machinery lifespan and reduce catastrophic component failure through the scientific...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Magazine round up | 14 March 2025
Magazine round up | 14 March 2025
14th March 2025

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.216 0.302s - 172pq - 2rq
Subscribe Now