https://newsletter.en.creamermedia.com
Construction|Dewatering|Mining|PROJECT|Resources|Safety|Water
Construction|Dewatering|Mining|PROJECT|Resources|Safety|Water
construction|dewatering|mining|project|resources|safety|water

Image speeds up mineral sands project construction

The Atlas camp was recently completed

The Atlas camp was recently completed

18th October 2024

By: Creamer Media Reporter

     

Font size: - +

Mineral sands company Image Resources has cleared the final construction approvals for its Atlas project, north of Perth, with water licences being issued.

The company started roadwork and civil construction on a temporary 5C water abstraction licence, however, the receipt of the full licences for abstraction and mine dewatering will accelerate construction and mine development rapidly.

“Although Atlas is still in the early stages of construction, we are already seeing the same high-quality project delivery that we achieved with the Boonanarring project in 2018. The Atlas mining camp has been completed on time, on budget, and, most importantly, without any injuries.

“Our priority remains safety, but we are also looking for opportunities to streamline and shorten a typical six- to eight-month construction timeline through efficient planning and execution,” said MD and CEO Patrick Mutz.

Image aims to be in full production at Atlas, located 100 km north of Boonanarring, in the half-year ended June 30, 2025.

At Atlas, production of about 210 000 t/y of heavy minerals concentrate for 711 000 t/y is envisaged over the life-of-mine. The project has a resource of 18.1-million tonnes at 6% heavy mineral, with a mineral assemblage that includes 9.3% zircon, 46% ilmenite, 4% leucoxene and 6.5% rutile. Mineral reserves are estimated at 9.5-million tonnes at 8.1% heavy mineral, with a mineral assemblage that includes 10.6% zircon, 51% ilmenite, 4.5% leucoxene and 7.5% rutile.

Edited by Creamer Media Reporter

Comments

Showroom

Hanna Instruments (Pty) Ltd
Hanna Instruments (Pty) Ltd

We supply customers with practical affordable solutions for their testing needs. Our products include benchtop, portable, in-line process control...

VISIT SHOWROOM 
Rio-Carb
Rio-Carb

Our Easy Access Chute concept was developed to reduce the risks related to liner maintenance. Currently, replacing wear liners require that...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.204 0.31s - 278pq - 2rq
Subscribe Now