https://newsletter.en.creamermedia.com
Africa|Coal|Construction|Design|Eskom|Power
Africa|Coal|Construction|Design|Eskom|Power
africa|coal|construction|design|eskom|power

INCONVENIENT TRUTH

1st November 2019

By: Darlene Creamer

     

Font size: - +

The fact that South Africa has not procured any new electricity capacity from independent power producers since 2014 is biting. Despite absolutely no demand growth for a decade, the country is failing to keep the lights on largely because Eskom’s undermaintained coal fleet is unable to operate reliably – it is also unlikely to recover to production levels foreseen earlier in the crisis. What’s more, the new coal plants have now also been derated against their original nameplate output levels, owing to design and construction problems. Eskom is, thus, left with only one balancing lever in the short term: load-shedding.

Comments

Showroom

Werner South Africa Pumps & Equipment (PTY) LTD
Werner South Africa Pumps & Equipment (PTY) LTD

For over 30 years, Werner South Africa Pumps & Equipment (PTY) LTD has been designing, manufacturing, supplying and maintaining specialist...

VISIT SHOWROOM 
SMS group
SMS group

At SMS group, we have made it our mission to create a carbon-neutral and sustainable metals industry.

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Magazine video image
Magazine round up | 29 November 2024
29th November 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:1.55 1.659s - 180pq - 2rq
Subscribe Now