Project Description
Kariba South is an underground powerhouse, consisting of six 125 MW vertical shaft Francis turbines.

The extension project will consist of two 150 MW vertical-axis Francis turbines, two three-phase step-up transformers and direct-coupled synchronous-type generators. Each generator is rated at 180 MVA, 50 Hz and 18 kV.

The facility will have a designed head of 89 m, a flow rate of 376 m3/s and a conventional submerged intake with trash racks and bulkhead gate slots. The surge chamber will be 60 m high with a diameter of 25 m.

The design also includes two 7-m-diameter concrete-lined low-pressure tunnels, two 7-m-diameter inclined or vertical shafts, two 6.5-m-diameter concrete-lined tunnels, two 6.5-m-diameter steel-lined penstock sections, and an underground powerhouse cavern about 24 m wide, 36 m high and 94 m long.

Value
The project is estimated to cost $400-million.

Duration
The project is expected to be completed in 2015.

Client
Zimbabwe Power Company (ZPC).

Key Contracts and Suppliers
Hatch & Zimbabwe Infrastructure Development Group, or ZAIDG, (consulting engineer) and KPMG (financial adviser).

Latest Developments
Engineering, procurement and construction tender documents will be issued to the shortlisted bidders in November, followed by a four-month bidding period.

On Budget and on Time?
The project is in progress.

Contact Details for Project Information
Hatch, tel +1 905 855 7600, fax +1 905 855 8270 or email hatch@hatch.ca.
ZPC, tel +263 4 250 407/9, fax +263 4 794 828/702 840/794 827/794 820
or email info@zpc.co.zw.
KPMG, tel +27 11 647 7111 or fax +27 11 647 8000.
ZAIDG steering committee member Wingfield Vengesayi, email wtvengesayi@gmail.com.
 

Edited by Martin Zhuwakinyu
Creamer Media Senior Deputy Editor

Article Enquiry

Email Article

Save Article

To advertise email advertising@creamermedia.co.za or click here

Comments

Latest Multimedia

Photo of Martin Creamer
On-The-Air (21/11/2025)
Updated 1 hour 31 minutes ago By: Martin Creamer

Latest News

Magazine Cover Image
Magazine round up | 21 November 2025
21st November 2025

Showroom

ABB Electrification
ABB Electrification

Electrifying the world in a safe, smart, and sustainable way, ABB Electrification is a global technology leader in electrical distribution and...

VISIT SHOWROOM 
Vikela Aluvin (Pty) Ltd
Vikela Aluvin (Pty) Ltd

Complete range of security sealing solutions including security seals bags and labels.

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Magazine Cover Image
Magazine round up | 21 November 2025
21st November 2025
Reunert’s stronger H2 boosts muted FY25 results
Reunert’s stronger H2 boosts muted FY25 results
20th November 2025 By: Natasha Odendaal

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.21 0.314s - 186pq - 2rq
Subscribe Now