https://newsletter.en.creamermedia.com
Africa|Cranes|Engineering|engineering news|Forklifts|Health|Installation|Lifting|Modular|Packaging|Paper|PROJECT|Project Management|Projects|Safety|Service|Steel|Telehandlers|transport|Trucks|Equipment|Maintenance|Packaging|Solutions
Africa|Cranes|Engineering|engineering news|Forklifts|Health|Installation|Lifting|Modular|Packaging|Paper|PROJECT|Project Management|Projects|Safety|Service|Steel|Telehandlers|transport|Trucks|Equipment|Maintenance|Packaging|Solutions
africa|cranes|engineering|engineering-news|forklifts|health|installation|lifting|modular|packaging-company|paper|project|project-management|projects|safety|service|steel|telehandlers|transport|trucks|equipment|maintenance|packaging|solutions

Lifting project comes to a close

A night time photo of a large truck mounter crawler crane, lifting boiler plant elements for the refurbishment of a boiler plant at a paper mill in  South Africa

HOT N HEAVY The heavier elements of the boiler refurbishment were undertaken by Lovemore Bros

29th April 2022

By: Halima Frost

Senior Writer

     

Font size: - +

Heavy lifting and rigging specialist Lovemore Bros has successfully concluded a longstanding contract with a global pulp and paper company based in South Africa.

The contract, initially signed in February 2019, commenced in May 2019 and concluded in February 2022.

The project entailed the installation of a complete boiler, digester and evaporation plant at a pulp and paper mill in KwaZulu-Natal.

“Lovemore Bros’ mechanical projects division played an integral part in the machine moving and rigging service for the project, offering technical solutions to complex problems,” says Lovemore Brothers Mechanical Projects manager Julie Nel.

She adds that the project had a broad scope, from maintenance rigging and abnormal transport, using a self-propelled modular trailer (SPMT) for the transport and installation of boiler, digester and evaporation plant modules of up to 240 t.

“The SPMT made light work of the narrow spaces and heavy loads,” she enthuses.

Further, the company’s experienced engineers motivated built-to-order concepts to assist in transporting and lifting into position structural modules, large tanks, economisers and chillers, besides others.

The team assigned to the project was positioned on site for the duration of the project, which consequently allowed for additional tasks to be awarded to Lovemore Bros.

Nel says the fleet that was dispatched to the project included five crane trucks, each with a lifting capacity of up to 22 t; telehandlers; forklifts; and a number of extendable rear-steer low bed trailers.

“The on-site fleet was complemented by a 45 t stack reacher and a number of mobile cranes.

A professional project management team took on the task of managing the vast array of machinery on site, with up to 40 personnel of differing skills and disciplines.

Dealing with the interactions of multiple contactors and an ever-changing site landscape was also a constant battle amid the company’s having to transport massive structures and equipment.

It is notable that this particular project was not the only project that the company has undertaken in the paper milling sector recently.

“The company was integral in the lifting requirements at the boiler recovery and rebuild at another multinational packaging and paper group’s mill in Richards Bay, in KwaZulu-Natal, Lovemore Bros Heavy Rigging manager Shane Hawyes tells Engineering News.

“Twelve rigging teams and a large selection of lifting machinery were available on site for the three-month project, for which we completed our scope in December last year,” he adds.

The machinery on site included a 750 t crawler crane and supporting crane trucks, making Lovemore Bros well equipped to handle all the lifting requirements of the project, says Hawyes.

The 750 t crane is equipped with a main boom of 56 m, and a luffer of 70 m that was used first to remove the old steel drum. This entailed a 70 t lift at a 55 m radius within 90 m hook height, Hawyes enthuses.

According to the client, the intense project was the biggest shutdown in that client’s South African history.

Hawyes says one of the greatest challenges of the project was effecting a clear line of communication among all the contractors, staff and machines on site.

Further, health and safety issues that arise because of lifting and moving large objects meant that the company had to have strict lift procedures and safety watches in place.

“We mitigated these by collaborating with all relevant parties, and managing an effective lifting plan,” he concludes.

Edited by Zandile Mavuso
Creamer Media Senior Deputy Editor: Features

Comments

 

Showroom

Goodwin Submersible Pumps Africa (Pty) Ltd
Goodwin Submersible Pumps Africa (Pty) Ltd

Goodwin Submersible Pumps Africa is sole distributors for Goodwin electrically driven, submersible, abrasion resistance slurry pumps.

VISIT SHOWROOM 
Weir
Weir

Weir is a global leader in mining technology. We recognise that our planet’s future depends on the transition to renewable energy, and that...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Magazine round up | 13 December 2024
Magazine round up | 13 December 2024
13th December 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.344 0.443s - 197pq - 2rq
Subscribe Now