https://newsletter.en.creamermedia.com
Construction|Design|Efficiency|Energy|Engineering|Industrial|Motors|PROJECT|Projects|Safety|Service|SMS|SMS Group|Steel|System|Technology|Equipment
Construction|Design|Efficiency|Energy|Engineering|Industrial|Motors|PROJECT|Projects|Safety|Service|SMS|SMS Group|Steel|System|Technology|Equipment
construction|design|efficiency|energy|engineering|industrial|motors|project|projects|safety|service|sms|sms-group|steel|system|technology|equipment

Lower energy consumption, higher filter performance

12th December 2016

  

Font size: - +

This article has been supplied.

SMS group  (3.06 MB)

Sweden-based Uddeholm AB Hagfors, manufacturer of tool steel for industrial tools, has successfully commissioned phase one of the modernization of the EAF fume treatment plant with latest filter technology from SMS group www.sms-group.com . As phase one of the project, SMS group upgraded the roof canopy installing a high-efficiency EAF fume evacuation hood – the patented SMS Frustum –, replaced the existing secondary duct system, installed a highly efficient axial cyclone and a new pulse jet filter.

The newly developed high-performance equipment from SMS group ensures a higher suction capacity of 800,000 cubic meters per hours with a ten filter compartment. The two fans with 710 kW variable speed motors reduce energy consumption thanks to the “Total Pressure 11” concept (280 mmWG). Additionally, the noise level recorded at a selected point on the property line was below 45 dBA at night and the dust content at the stack discharge was more than 50 percent lower than required. The new filter technology from SMS group thus helps Uddeholm to achieve better evacuation of the exhaust gases during the melting process in the electric arc furnace, while minimizing energy consumption.

Due to the improved suction efficiency of the existing canopy hood thanks to the “frustumized” design, the old filter, which had been planned to remain in operation, was switched off. This provided additional energy benefits.

With the substitution of the primary fume line, the second phase, planned for August 2017, will complete the EAF fume treatment plant modernization.

The first project phase was executed on a turnkey basis during a period of twelve months. The extremely high safety standards resulted in zero injuries and accidents.

The approach of lean engineering adopted in this modernization project provided for a tight execution and construction schedule. However, the experienced team of SMS group in Italy executed the project without delay. Such an approach is a decisive factor in the successful implementation of such projects as it provides balanced investment costs, a secure execution time and high-quality service.

Edited by Creamer Media Reporter

Comments

 

Showroom

Weir
Weir

Weir is a global leader in mining technology. We recognise that our planet’s future depends on the transition to renewable energy, and that...

VISIT SHOWROOM 
WearCheck
WearCheck

Leading condition monitoring specialists, WearCheck, help boost machinery lifespan and reduce catastrophic component failure through the scientific...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Magazine round up | 13 December 2024
Magazine round up | 13 December 2024
13th December 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.304 0.402s - 195pq - 2rq
Subscribe Now