Lower uMkhomazi water project – Phase 1, South Africa
Name of the Project
Lower uMkhomazi water project.
Location
eThekwini metropolitan municipality (Ward 99) and uMdoni local municipality (Ward 18), eThekwini, KwaZulu-Natal, South Africa.
Project Owner/s
The Trans-Caledon Tunnel Authority (TCTA) will implement the raw water component of the project and uMngeni-uThukela will implement the bulk water treatment component for distribution to the identified six water services authorities.
Project Description
The project includes the construction of a new dam and a 32 km raw-water conveyance tunnel and 5 km pipeline to uMlaza river. There will also be a balancing dam and water treatment works in the uMlaza river, with a gravity pipeline to the Umgeni water supply system that supplies water to more than five-million people and industries in the province.
The project is divided into two phases, with the first phase comprising a raw water component consisting of two independent systems – the Ngwadini system, with off-channel storage, and the Goodenough system, with abstraction works and a raw water storage reservoir.
Phase 2 entails a potable water component comprising a 100-million-litre-a-day water treatment works; a 3.5 km gravity main pipeline to Quarry reservoir; extending the capacity of Quarry reservoir to 30-million litres a day; and the construction of a Green Star-certified administration building.
Potential Job Creation
Not stated.
Capital Expenditure
R20-billion.
Planned Start/End Date
The project is expected to be completed in December 2027.
Latest Developments
None stated.
Key Contracts, Suppliers and Consultants
None stated.
Contact Details for Project Information
uMngeni-uThukela, tel +27 33 341 1111 or email info@umgeni.co.za.
TCTA, tel +27 12 683 12 31 or email info@tcta.co.za.
Comments
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation