N2 Cape Town to get R2bn upgrade, R7bn to be spent on N1, Huguenot Tunnel – Sanral
The South African National Roads Agency Limited (Sanral) has a number of multibillion-rand projects in the pipeline in its Western Region, which includes the Western and Northern Cape.
On a project-by-project basis, Western Region regional manager Randall Cable says a 12 km upgrade to the N2 in Cape Town between the Swartklip and Baden Powell interchanges is currently under design.
The project entails upgrading the highway from a four-lane to a six-lane or eight-lane freeway, upgrades to four interchanges, as well as improving pedestrian safety infrastructure.
A 6 km portion of the N2 must also be raised owing to increased water levels.
The project is estimated to cost R2-billion, and the tender is to be advertised in November.
On the N2 Garden Route, upgrades and improvements from Kraaibosch to Touws River in Wilderness are currently under construction, with more works planned in Phase 2 between Touws River and Die Vleie.
The combined estimated value of Phase 1 and Phase 2 of the N2 Wilderness upgrades is more than R1.5-billion.
The detailed design for the 13 km upgrade to the N1 from Cape Town’s Old Oak to Koelenhof interchanges has been completed, with the project estimated to cost more than R3-billion.
The project entails upgrading the freeway from four lanes to six lanes or eight lanes, improvements to five interchanges, as well as to pedestrian safety infrastructure.
Sanral says it is in final preparations to go to market for this project.
As for the 36-year-old Huguenot Tunnel on the N1, the roads agency says it has made improvements to the existing tunnel (south bore) in the last 24 months, which include upgrades to the tunnel lighting, ventilation and fire detection systems.
“The upgrade of the second tunnel (north bore) is overdue, and the final detailed design has recently been completed,” says Sanral.
Sanral says it is preparing to “go to market shortly” on this five-year construction contract.
The project will cost roughly R4-billion to complete.
The north bore tunnel was excavated at around the same time as the south bore tunnel. However, the north bore tunnel is currently only being used as an emergency escape for the south bore tunnel.
Comments
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation