https://newsletter.en.creamermedia.com
Africa|Construction|Design|Energy|Engineering|Environment|Gold|Hydropower|Infrastructure|PROJECT|Project Management|Road|Surface|Water|Weir|Environmental|Infrastructure
Africa|Construction|Design|Energy|Engineering|Environment|Gold|Hydropower|Infrastructure|PROJECT|Project Management|Road|Surface|Water|Weir|Environmental|Infrastructure
africa|construction|design|energy|engineering|environment|gold|hydropower|infrastructure|project|project-management|road|surface|water|Weir|environmental|infrastructure

Oxbow Hydropower ESIA contract awarded

5th December 2024

By: Natasha Odendaal

Creamer Media Senior Deputy Editor

     

Font size: - +

The Lesotho Highlands Development Authority (LHDA) has awarded the environmental and social impact assessment (ESIA) contract for the Oxbow Hydropower Scheme to a joint venture comprising Italy’s ELC Electroconsult, Lesotho’s Greenway Consultancy and South Africa’s Green Gold Group.

The R12.5-million contract, awarded in mid-November, is expected to be completed within a year, starting in January 2025.

This marks a significant step forward in the development of Phase II of the Lesotho Highlands Water Project (LHWP).

The ESIA contract follows the Oxbow Hydropower design and construction supervision contract awarded earlier in November.

The Oxbow Hydropower Scheme is a key component of Phase II of the LHWP, alongside the already underway Polihali dam and Polihali transfer tunnel.

The scope of the ESIA includes the comprehensive ESIA; development of environmental and social management plans and specialist studies; adherence to Lesotho's Environment Act of 2008 and international standards such as the IFC performance standards; supporting the application for a record of decision; informing site selection, engineering designs, construction specifications, as well as environmental and social monitoring requirements; and project management and contract administration.

The Oxbow Hydropower Scheme will feature a dam on the Malibamatso river, a gated intake structure, a headrace tunnel, a surface powerhouse and associated infrastructure.

It will also necessitate the diversion of the existing A1 national road and the construction of a diversion weir and transfer tunnel discharging to the ‘Muela reservoir.

Phase II builds upon the successful completion of Phase I of the LHWP in 2003.

The Oxbow Hydropower Scheme is a crucial step towards Lesotho achieving energy independence and reducing reliance on imported energy. It will contribute significantly to meeting the country's growing electricity demands.

Edited by Creamer Media Reporter

Comments

Latest Multimedia

Photo of Martin Creamer
On-The-Air (11/07/2025)
Updated 2 hours 31 minutes ago By: Martin Creamer

Showroom

VEGA Controls SA (Pty) Ltd
VEGA Controls SA (Pty) Ltd

For over 60 years, VEGA has provided industry-leading products for the measurement of level, density, weight and pressure. As the inventor of the...

VISIT SHOWROOM 
SABAT
SABAT

From batteries for boats and jet skis, to batteries for cars and quad bikes, SABAT Batteries has positioned itself as the lifestyle battery of...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Magazine cover image
Magazine round up | 11 July 2025
11th July 2025

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.269 0.361s - 187pq - 2rq
Subscribe Now