https://newsletter.en.creamermedia.com
Industrial|Iron Ore|Mining|SECURITY|Surface|Water|Operations
Industrial|Iron Ore|Mining|SECURITY|Surface|Water|Operations
industrial|iron-ore|mining|security|surface|water|operations

Rio Tinto and WA govt team up on Pilbara water

7th February 2025

By: Creamer Media Reporter

     

Font size: - +

The Western Australian government has signed a memorandum of understanding to join forces with mining company Rio Tinto to strengthen water security in the Pilbara.

The West Pilbara Water Supply Scheme (WPWSS) supplies the towns of Karratha, Wickham, Dampier, Roebourne, Point Samson and the industrial areas of Cape Lambert and the Burrup Peninsula.

Over the past five years the West Pilbara has frequently experienced yearly rainfall and streamflow below the long-term average. This has reduced groundwater recharge at Millstream and Bungaroo borefields, as well as surface water runoff at Harding Dam, which supply the WPWSS.

Abstraction from these sources is of significant concern to Traditional Owner groups such as the Yindjibarndi and Robe River Kuruma People.

Rio Tinto’s delivery of Stage 1 of the Dampier seawater desalination plant, at its existing Parker Point operations, will provide 4 GL/y of water. This will reduce abstraction from the Bungaroo borefield and is expected to be operational in 2026.

Negotiations between Water Corporation and Rio Tinto will assess, and if feasible, consider options to deliver Stage 2 which is expected to be operational in 2027. This will add a further 4 GL/y of water to shore up a short-term supply of drinking water through the West Pilbara scheme and will also reduce pressure on the Millstream Aquifer.

“We are pleased to partner with the Western Australian government in Stage 2 of the Dampier seawater desalination plant. We also welcome the news that it is prioritising the delivery of a further desalination plant for the region,” commented Rio Tinto iron-ore CEO Simon Trott.

He said that government’s large-scale plant would support Rio Tinto’s transition pathway to zero abstraction from the Bungaroo coastal supply borefield, as well as deliver clear benefits to the broader West Pilbara community.

Edited by Creamer Media Reporter

Comments

Latest News

Magazine round up | 14 March 2025
Magazine round up | 14 March 2025
14th March 2025

Showroom

Essentra Components
Essentra Components

We are responsible manufacturers of essential components. Manufacturing 80 million parts a week, we have over 1 billion parts in stock.

VISIT SHOWROOM 
RioCarb
Rio-Carb

Introducing the Rio-Carb Smart Chute Concept - a revolutionary advancement in materials handling, designed for the toughest industries like mining...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Magazine round up | 14 March 2025
Magazine round up | 14 March 2025
14th March 2025

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.15 0.241s - 170pq - 2rq
Subscribe Now