https://newsletter.en.creamermedia.com
Dewatering|Electrical|Energy|Environment|Exploration|Infrastructure|Mining|PROJECT|Projects|Services|Underground|Water|Maintenance|Infrastructure|Operations
Dewatering|Electrical|Energy|Environment|Exploration|Infrastructure|Mining|PROJECT|Projects|Services|Underground|Water|Maintenance|Infrastructure|Operations
dewatering|electrical|energy|environment|exploration|infrastructure|mining|project|projects|services|underground|water|maintenance|infrastructure|operations

Silverco Mining advances Mexico project towards production restart

7th January 2026

By: Darren Parker

Deputy Editor Online

     

Font size: - +

TSX-V-listed Silverco Mining has reached key operational and technical milestones at its 100%-owned Cusi silver project, in Mexico, signalling progress towards a planned restart of production.

Crucially, the company has successfully completed the dewatering of underground workings at the Promontorio area and has begun early-stage rehabilitation as part of its efforts to return the mine to active operation.

Following the dewatering, Silverco has mobilised crews to rehabilitate the underground workings. Early-stage works include scaling ramps, installing ground support and identifying, repairing and replacing underground infrastructure.

The company has also hired a project manager in Mexico to oversee the mine restart, while key discipline managers are being recruited to build out the operations team.

Rehabilitation efforts are focused on restoring primary access and essential services, including electrical, ventilation and water infrastructure, to meet the requirements of an active production environment. These upgrades also extend utility services into priority exploration areas to prepare for the 2026 underground drill programme.

Silverco has engaged JDS Energy & Mining to produce a restart study for the Cusi project, leveraging the recently updated mineral resource estimate (MRE). The study is designed to define the economic and operational parameters necessary for resuming mining, with results expected late in the first quarter of this year.

Concurrently, metallurgical optimisation test work is being conducted by Forte Analytical on mineralised composites from the Promontorio and San Miguel zones. This programme is aimed at maximising metal recoveries, optimising processing parameters, and defining concentrate specifications for potential off-take agreements.

“Completing the dewatering of Promontorio is a critical operational milestone that paves the way for our return to production at Cusi. With JDS now advancing the restart study and our crews on the ground beginning essential rehabilitation, we are rapidly transitioning from exploration and maintenance into an active development phase,” Silverco CEO Mark Ayranto said on January 6.

Promontorio will serve as Silverco’s initial mine restart area, given its significant existing development infrastructure, with Ayranto adding that the restart study and the remaining 2025 drill results will be delivered early this year.

“With silver spot prices hitting all-time highs, Silverco is positioned to take imminent benefit of the current metal price regime. The Cusi project benefits from being a permitted operation with significant existing infrastructure – including a 1 200 t a day mill and the now-dewatered underground workings at Promontorio.

“This advantage allows us to move quickly with urgency to transition Cusi back into production to capture this value, derisking the project at an opportune time when the market is demanding high-quality silver projects,” Ayranto said.

The company is also continuing its exploration efforts, integrating recently flown light detection and ranging survey data to refine high-priority targets for the 2026 programme, while the remainder of the 2025 drill results is expected in early quarter one.

The updated MRE, published on December 9, 2025, confirmed Cusi as a high-grade, silver-primary project. Silverco is finalising the supporting technical report, which is expected to be filed this month.

Edited by Chanel de Bruyn
Creamer Media Senior Deputy Editor Online

Article Enquiry

Email Article

Save Article

Feedback

To advertise email advertising@creamermedia.co.za or click here

Comments

Showroom

Essentra Components
Essentra Components

We are responsible manufacturers of essential components. Manufacturing 80 million parts a week, we have over 1 billion parts in stock.

VISIT SHOWROOM 
Iritron
Iritron

Iritron delivers advanced automation, control, and optimisation solutions to the Mining, Minerals & Metals, Consumer Package Goods and...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Photo of Martin Creamer
On-The-Air (12/12/2025)
12th December 2025 By: Martin Creamer
Magazine round up | 10 December 2025
Magazine round up | 12 December 2025
12th December 2025

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







301

sq:0.179 0.279s - 191pq - 2rq
Subscribe Now