Volkswagen completes second phase of R90m Kariega solar project
Volkswagen Group Africa (VWGA) has completed the second phase of a solar PV project at its Kariega manufacturing plant, in the Eastern Cape.
The multiphase solar project, located at the VWGA employee car park, began in 2022 as part of the car maker’s long-term plan to transition its operations toward renewable-energy sources.
The first phase of 3.1 MWp, completed in 2024, and comprising 5 712 panels, laid the foundation for the current expansion, and demonstrated the assembly plant’s potential to integrate solar energy into its production network.
The second phase added 2.1 MWp to the existing renewables infrastructure at the plant.
The newly installed 3 582 solar panels – 585 W each – are projected to generate roughly 2 699 MWh of clean energy.
The R35-million capital investment in Phase 2 adds up to a total investment of R90-million.
With both phases now complete, the total solar power capacity of the project stands at 5.2 MWp, capable of producing 7 125 MWh/y.
“The completion of the second phase of our solar project marks another major milestone in our journey towards fully sustainable manufacturing,” says VWGA production director Ulrich Schwabe.
“This shows our commitment to using cleaner energy and making our operations even more environmentally responsible.”
Article Enquiry
Email Article
Save Article
Feedback
To advertise email advertising@creamermedia.co.za or click here
Comments
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation


















