Warman® MCR® pump more than doubles wear life to save Agnico Eeagle’s Laronde Gold Mine US$70,000 p.a.

A Warman® MCR® pump improved wear life by 130% in this SAG mill discharge application at LaRonde gold mine in Quebec.

After 1,400 hours of operation in a demanding application, this Warman® MCR® 250 pump impeller shows minimal signs of wear.

13th October 2020

By: Creamer Media Reporter

     

Font size: - +

This article has been supplied.

Modern design and superior wear materials halve annual pump rebuilds in highly abrasive application, reducing overall maintenance time by 40%.

The superiority of genuine Warman® pumps and parts was proven in a trial comparing the performance of a Warman® MCR® 250 pump against a Warman® AH® pump fitted with non-genuine spare parts at Agnico Eagle Mines’ LaRonde gold mine in Quebec, Canada.

The mine had been using two Warman® AH® 12/10 slurry pumps to manage its SAG mill discharge since operations commenced in 1988. While these pumps were the latest technology at the time, the very coarse slurry was causing the pumps to wear out after just 1,600 hours.

“When a replicator proposed a trial of non-OEM pump liners and parts instead of our genuine Warman parts, they promised to double the wear life of the existing pump components. Our engineers investigated the root cause of the wear life problems experienced and decided a Warman MCR pump would achieve much better results compared to the AH pump with non-OEM parts”, states Mike Swintak, Regional Senior Product Manager for Weir Minerals.

Instead of doubling it, the other manufacturer’s liners and impellers decreased the pump’s wear life by 300 hours, wearing out after just 1,300 hours. In addition to requiring six rebuilds per year, the non-genuine parts interrupted production due to discovery of premature cracks in the liner.

Meanwhile, the Warman® MCR® 250 pump achieved 3,000 hours of continuous operation, requiring only three rebuilds and lowered spare parts costs alone by 36%, or US$70,00 per year.

“The fantastic results achieved at LaRonde weren’t just due to the superior wear resistance offered by the pump’s Ultrachrome A05 wear material and superior hydraulic design of the MCR pump. Our engineers worked closely with Angico Eagle operators to remove problems throughout the circuit contributing to the low wear life being achieved, such as revising their pump box level control procedures and monitoring system to ensure a constant level of 50-75%,” says Swintak.

Weir Minerals Africa

Edited by Creamer Media Reporter

Comments

 

Showroom

ESAB showroom image
ESAB South Africa

ESAB South Arica, the leading supplier of high-end welding and cutting products to the Southern African industrial market is based in...

VISIT SHOWROOM 
Weir
Weir

Weir is a global leader in mining technology. We recognise that our planet’s future depends on the transition to renewable energy, and that...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Magazine round up | 13 December 2024
Magazine round up | 13 December 2024
13th December 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:6.085 6.18s - 197pq - 2rq
Subscribe Now