https://newsletter.en.creamermedia.com

Receive our free daily newsletter:

Zimbabwe's sole nickel mine placed under administration
3rd May 2024 By: Reuters

Zimbabwe's only operating nickel mine was on Thursday placed under administration, according to a government notice, seven months after halting production due to equipment failure and low prices.... 


A clean flush for Mthatha sewer line
8th September 2021

The rapid expansion of Mthatha and the surrounding peri-urban settlements necessitated water and sewer infrastructure upgrades. To accommodate anticipated future expansion a sewer line of 1.2m... 


GF Piping Systems Barracude DN200 valve
Valves prove advantageous for local mining
30th July 2021 By: Khutso Maphatsoe

Manufacturing company GF Piping Systems launched its Plastic Butterfly Valve 565 in April at its headquarter in Schaffhausen, Switzerland. The 565 valves, manufactured in Seewis im Prättigau,... 


Kariba Dam rehab project making progress
29th January 2021 By: Natasha Odendaal

Binational organisation the Zambezi River Authority (ZRA) is progressing work at the Kariba Dam Rehabilitation Project (KDRP). The authority says that ongoing KDRP works comprise two components,... 


Odysseus tracking to schedule
3rd December 2020 By: Esmarie Iannucci

Nickel miner Western Areas’ Odysseus mine is on track for first nickel-in-concentrate production at its Odysseus mine, in Western Australia, as shaft hoisting equipment arrived for the project from... 


Increasing Importance Of Sensors In Construction Machinery
Increasing Importance Of Sensors In Construction Machinery
16th September 2019

The role of sensor technology will become increasingly important in construction equipment, with encoders being used for positioning, angular, speed and length measurements in a variety of... 


Inspection contract awarded
12th September 2014

Swiss-based inspection, verification, testing and certification services provider Société Générale de Surveillance (SGS-SA) was awarded a contract in February to provide statutory inspection... 


Platreef platinum group metals/copper/nickel/gold project, South Africa
Platreef platinum group metals/copper/nickel/gold project, South Africa
12th September 2014

Surface construction work for Shaft No 1 was suspended on May 26, 2014, and will resume once the mining right, which was approved in May this year, has been executed. 


1

Showroom

Essentra Components
Essentra Components

We are responsible manufacturers of essential components. Manufacturing 80 million parts a week, we have over 1 billion parts in stock.

VISIT SHOWROOM 
Nebula Safety Boot
BOVA Safety Wear

BOVA cemented their reputation in Africa by delivering high quality engineering through their range of safety footwear. 21 years after producing...

VISIT SHOWROOM 
Schauenburg SmartMine IoT
Schauenburg SmartMine IoT

SmartMine IoT has been developed with the mining industry in mind, to provides our customers with powerful business intelligence and data modelling...

VISIT SHOWROOM 
JusChek® - Disposable saliva test
Alco-Safe

Developed to exceed the latest EN 15964 standards for police breathalysers proving that it will remain accurate and reliable for many years to come.

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







pqt: 0.146s - ct: 0.363s - 213pq - 2rq
Subscribe Now