https://newsletter.en.creamermedia.com
Coal|Consulting|Energy|Safety|Operations
Coal|Consulting|Energy|Safety|Operations
coal|consulting-company|energy|safety|operations

China's Inner Mongolia halts coal mines for exceeding output plans, document shows

16th September 2025

By: Reuters

  

Font size: - +

Inner Mongolia, China’s largest coal-producing region, has ordered 15 mines to halt production after they were found to have exceeded their approved output plans, a document from the Inner Mongolia Autonomous Region Energy Bureau showed.

China launched inspections in major coal hubs in July and asked local authorities to report whether mines had exceeded output in 2024 and the first half of 2025, as Beijing seeks to tackle overcapacity in the sector.

Reuters called the Inner Mongolia Autonomous Region Energy Bureau, and the person who answered confirmed the document detailing the results of the region’s production capacity inspection and the key details.

The investigation results showed that 15 mines in Ordos exceeded their approved capacity by more than 10% in the first half of 2025. They have been ordered to suspend operations and may resume only after passing inspections by regional safety regulators, according to the document.

The document did not provide a timeline for when the inspections will take place. The halted mines have combined annual capacity of about 34.6 million metric tons, according to Mysteel, a Chinese commodity consulting firm.

As of September 16, five of the 15 mines, with combined capacity of 19.3-million tons per year, were ordered to suspend production for five to seven days due to safety hazards. Four mines have since resumed normal production after the inspections, according to Mysteel.

China’s most-traded coking coal futures contract on the Dalian Commodity Exchange rose 5.84%, or 68.5 yuan ($9.63) a ton on Tuesday.

The market rallied after state media published President Xi Jinping's call on Monday for the “orderly exit” of outdated production capacity and the curbing of “disorderly” price competition.

Edited by Reuters

Comments

Research Reports

Showroom

Essentra Components
Essentra Components

We are responsible manufacturers of essential components. Manufacturing 80 million parts a week, we have over 1 billion parts in stock.

VISIT SHOWROOM 
Hanna Instruments (Pty) Ltd
Hanna Instruments (Pty) Ltd

We supply customers with practical affordable solutions for their testing needs. Our products include benchtop, portable, in-line process control...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Photo of Martin Creamer
On-The-Air (12/09/2025)
12th September 2025 By: Martin Creamer
Magazine round up | 12 September 2025
Magazine round up | 12 September 2025
12th September 2025

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.044 0.136s - 186pq - 2rq
Subscribe Now