https://newsletter.en.creamermedia.com
Africa|Container|Efficiency|Resources|Safety|System|Technology|Terminals|Testing|Transnet|Transnet Port Terminals|Equipment|Operations
Africa|Container|Efficiency|Resources|Safety|System|Technology|Terminals|Testing|Transnet|Transnet Port Terminals|Equipment|Operations
africa|container|efficiency|resources|safety|system|technology|terminals|testing|transnet|transnet-port-terminals|equipment|operations

Durban Container Terminal receives another eight straddle carriers

21st September 2020

By: Donna Slater

Features Deputy Editor and Chief Photographer

     

Font size: - +

Another eight new electric straddle carriers have arrived at the Durban Container Terminal (DCT) Pier 2 fully assembled, completing the terminal’s order of 23 for the current calendar year.

This followed the delivery of 13 of the electric straddle carriers in August.

The straddle carriers boast improved drive technology, starting reliability, maintainability, safety, usability and ergonomics, and enable a computer application to read data from the control system through Ethernet – providing comprehensive detail on statistics, real-time performance data and operational reports.

Pier 2 terminal manager Zamo Ngcobo says the arrival of the straddle carriers, fully assembled, is a move that will result in improvements in operations within a short space of time.

He adds that commissioning and endurance testing will still be conducted, with handover estimated in early October.

DCT Pier 2 is responsible for handling most of South Africa’s container volumes, and the investment in container-handling equipment to replace ageing equipment is aimed at improving efficiency within the system.

Complementing the equipment boost is the increased number of resources working the vessels, a new terminal structure, technological advancements for better decision-making and the implementation of a mandatory truck appointment system.

DCT Pier 2 is one of 16 sea-cargo and three inland terminals managed by Transnet Port Terminals that have benefited from the R2-billion set aside to invest in replacement equipment this current calendar year.

A further 22 straddle carriers are on order and expected to arrive between March and May 2021.

Edited by Chanel de Bruyn
Creamer Media Senior Deputy Editor Online

Comments

Showroom

Universal Storage Systems (SA)
Universal Storage Systems (SA)

South African leader in Steel -Racking, -Shelving, and -Mezzanine flooring. Universal has innovated an approach which encompasses conceptualising,...

VISIT SHOWROOM 
ESAB showroom image
ESAB South Africa

ESAB South Arica, the leading supplier of high-end welding and cutting products to the Southern African industrial market is based in...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.269 0.369s - 195pq - 2rq
Subscribe Now