https://newsletter.en.creamermedia.com
Construction|Efficiency|Engineering|Environment|Financial|Flow|Gold|PROJECT|Projects|Resources|Water|Flow|Environmental
Construction|Efficiency|Engineering|Environment|Financial|Flow|Gold|PROJECT|Projects|Resources|Water|Flow|Environmental
construction|efficiency|engineering|environment|financial|flow-company|gold|project|projects|resources|water|flow-industry-term|environmental

Integra on accelerated federal permitting path for DeLamar

13th January 2026

By: Mariaan Webb

Creamer Media Senior Deputy Editor Online

     

Font size: - +

Canadian miner Integra Resources has secured a clearly defined and accelerated federal permitting schedule for its DeLamar heap leach gold/silver project in Idaho, US, materially reducing regulatory uncertainty and positioning the project for a potential construction decision by 2027.

The US Bureau of Land Management (BLM) has formally established a National Environmental Policy Act (Nepa) permitting schedule for the DeLamar project. Under the schedule, a notice of intent is expected in the second quarter of 2026, followed by a 15-month Nepa review period, with an environmental-impact statement and record of decision targeted for the third quarter of 2027.

Integra said the timeline was materially shorter than previously contemplated permitting scenarios and represented a significant step forward in advancing DeLamar toward a build-ready profile.

The permitting milestone follows the release of a feasibility study late last year that confirmed robust economics for a large-scale openpit oxide heap leach operation, strengthening the project’s development credentials at a time of elevated gold and silver prices.

“The establishment of a BLM-defined federal permitting timeline marks a transformational milestone for both DeLamar and Integra,” said president, CEO and director George Salamis.

“For the first time, the project has a clear, accelerated, and fact-based pathway through the Nepa process, materially reducing one of the most significant barriers to mine development in the United States. This schedule is meaningfully shorter than previously anticipated and substantially improves project certainty, capital efficiency, and time-to-value for our shareholders.”

Salamis added that, when combined with the feasibility study, the milestone positioned DeLamar among the most advanced precious metals development projects in the US.

“With strong economics, early free cash flow potential, and a defined federal permitting runway, we believe DeLamar is approaching a build-ready profile and is well positioned to deliver long-term value in a constructive gold and silver market environment,” he said.

The DeLamar project, which includes the DeLamar and Florida Mountain deposits in south-west Idaho, has benefited from nearly a decade of environmental baseline data collection, engineering studies and mine planning. Integra said this work had prepared the project for rigorous environmental review and enabled a more efficient permitting process.

Once the notice of intent is published in the federal register, the BLM will commence public scoping, engaging government agencies, Tribal Nations and local communities to identify issues and inform the development of project alternatives and mitigation measures. The Nepa process is expected to culminate in the identification of a preferred alternative and associated mitigation requirements, including continued engagement with Tribal Nations and the establishment of a Programmatic Agreement.

While the environmental-impact statement is under review, Integra plans to advance other federal and state permits required for construction, including groundwater protection, wastewater discharge, cyanidation, air quality and Clean Water Act approvals, as well as finalising a reclamation plan supported by financial assurance.

The 2025 feasibility study outlines a ten-year mine life producing 1.1-million ounces of gold equivalent at an all-in sustaining cost of $1 480/oz. At base-case prices, the project delivers an after-tax net present value of $774-million and an internal rate of return of 46%, rising to $1.7-billion and 89%, respectively, at recent metal prices.

Integra currently operates the Florida Canyon mine in Nevada and is advancing DeLamar and its Nevada North project as part of its broader growth strategy in the Great Basin region of the US.

Edited by Creamer Media Reporter

Article Enquiry

Email Article

Save Article

Feedback

To advertise email advertising@creamermedia.co.za or click here

Comments

Latest News

OPEC Fund president Dr Abdulhamid Alkhalifa and AfDB president Dr Sidi Ould Tah
OPEC Fund and AfDB reinforce their cooperation
12th January 2026 By: Rebecca Campbell

Showroom

SafeQuip
SafeQuip

SafeQuip is a leading distributor and manufacturer of fire safety solutions, offering a comprehensive range of products designed to meet all...

VISIT SHOWROOM 
Sulzer Pumps (SA) (Pty) Ltd
Sulzer Pumps (SA) (Pty) Ltd

Sulzer South Africa, established in 1922, partners with critical industries like power, oil & gas, water, mining, and chemicals to boost...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Photo of Martin Creamer
On-The-Air (09/01/2026)
9th January 2026 By: Martin Creamer
Photo of Martin Creamer
On-The-Air (12/12/2025)
12th December 2025 By: Martin Creamer

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







301

sq:0.418 0.53s - 189pq - 2rq
Subscribe Now