https://newsletter.en.creamermedia.com
Africa|Business|Construction|Contractor|Design|Energy|Eskom|Freight|generation|Infrastructure|Power|PROJECT|Projects|rail|Repairs|Road|Roads|System|Systems|Transnet|transport|Infrastructure
Africa|Business|Construction|Contractor|Design|Energy|Eskom|Freight|generation|Infrastructure|Power|PROJECT|Projects|rail|Repairs|Road|Roads|System|Systems|Transnet|transport|Infrastructure
africa|business|construction|contractor|design|energy|eskom|freight|generation|infrastructure|power|project|projects|rail|repairs|road|roads|system|systems|transnet|transport|infrastructure

National roads need over R307-billion of repairs

Transport Minister Barbara Creecy

Transport Minister Barbara Creecy

10th September 2024

By: Bloomberg

  

Font size: - +

South Africa, which already faces a heavy bill to upgrade its port, rail and electricity infrastructure, needs R307-billion to repair and improve its sprawling national road system.

The South African National Roads Agency (Sanral) requires design and construction work on 1 437 projects, Transport Minister Barbara Creecy said in a presentation to lawmakers in Cape Town on Tuesday.

Repair work by the company, which manages 4% of the nation’s 750 000-kilometer road network, has been dogged by delays caused by challenges ranging from contractors going out of business to extortion by organised crime, Creecy said.

Firms brought in to complete the work when a contractor quit due to demands by criminals have included China Communications Construction Co., she said.

South Africa’s road network is the 11th-longest in the world, while Sanral’s small portion of that carries 70% of the nation’s long-distance freight. The costly outlook reflects similar projections for other State-owned companies.

Power utility Eskom faces a R390 billion upgrade of the electricity grid to add more generation from clean-energy sources. Transnet needs to spend billions to improve signalling systems and repair trains that are inoperable without spare parts.

Provincial road projects have design and construction budgets averaging about R17-billion annually through 2027, the presentation showed, along with a more extensive list of incomplete, abandoned and delayed projects.

Creecy recommended support for the transport department “through leadership reform within the police to reinforce governance structure” and strengthening project monitoring.

 

Edited by Bloomberg

Comments

Showroom

Alcohol Breathalysers
Alcohol Breathalysers

Supplier & Distributor of the Widest Range of Accurate & Easy-to-Use Alcohol Breathalysers

VISIT SHOWROOM 
Alco-Safe
Alco-Safe

Developed to exceed the latest EN 15964 standards for police breathalysers proving that it will remain accurate and reliable for many years to come.

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Photo of Martin Creamer
On-The-Air (15/11/2024)
15th November 2024 By: Martin Creamer

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.186 0.288s - 216pq - 4rq
Subscribe Now