https://newsletter.en.creamermedia.com
Africa|Energy|Eskom|Power|PROJECT|Projects|Renewable Energy|Renewable-Energy|Resources|Solar|Operations
Africa|Energy|Eskom|Power|PROJECT|Projects|Renewable Energy|Renewable-Energy|Resources|Solar|Operations
africa|energy|eskom|power|project|projects|renewable-energy|renewable-energy-company|resources|solar|operations

Pan African Resources renewable-energy projects, South Africa

Image of solar energy panels

28th July 2023

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Pan African Resources renewable-energy projects.

Location
Barberton Mines’ Fairview operation and Evander Mines, in Mpumalanga, and Bela-Bela, in Limpopo.

Project Owner/s
Pan African Resources.

Project Description
Pan African’s renewable-energy projects include:

  • studies for the development of the 8.75 MWac Fairview solar facility at its Barberton operations. Based on preliminary studies, the facility will reduce the group’s carbon emissions by about 22 000 t/y of carbon dioxide. The solar facility is expected to have an economic life of more than 25 years, which is sufficient for the mine’s current 20-year mine life.
  • a power purchase agreement with Sturdee Energy for a 40 MW wheeled renewable-energy solution from its Bela-Bela solar photovoltaic (PV) facility, with the generation capacity being available to any of Pan African’s operations. The solar PV facility is expected to provide about 112 399 MWh/y of renewable energy for Pan African and will be connected to the Eskom grid by a 132 kV line in the area of Bela-Bela.
  • feasibility studies to expand the Evander Mines’ recently completed 10 MW solar PV facility by at least another 12 MW to secure additional capacity for the mine’s long-life 24, 25 and 26 Level projects.
  • feasibility studies for a solar PV facility for its recently acquired Mogale tailings retreatment plant, in Gauteng.

Potential Job Creation
Not stated.

Capital Expenditure
Not stated.

Planned Start/End Date
Not stated.

Latest Developments
None stated.

Key Contracts, Suppliers and Consultants
None stated.

Contact Details for Project Information
Pan African Resources, tel +27 11 243 2900 or email info@paf.co.za.

Edited by Martin Zhuwakinyu
Creamer Media Senior Deputy Editor

Comments

Showroom

M and J Mining
M and J Mining

M and J Mining are leading suppliers of physical support systems as used by the underground mining industry. Our selection of products are not...

VISIT SHOWROOM 
Rio-Carb
Rio-Carb

Our Easy Access Chute concept was developed to reduce the risks related to liner maintenance. Currently, replacing wear liners require that...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Photo of Martin Creamer
On-The-Air (15/11/2024)
15th November 2024 By: Martin Creamer

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.118 0.301s - 196pq - 2rq
Subscribe Now