https://newsletter.en.creamermedia.com
Eskom|Power|Service|System|Maintenance
Eskom|Power|Service|System|Maintenance
eskom|power|service|system|maintenance

Stage 4 loadshedding all week, says Eskom

Cars parked at traffic lights amid power outages

Photo by Creamer Media's Donna Slater

27th November 2023

By: News24Wire

  

Font size: - +

Due to the increasing demand combined with insufficient generating capacity and the need to manage the emergency reserves, Stage 4 loadshedding will be implemented from 14:00 today until 05:00 on Saturday, Eskom said on Monday.

Eskom will closely monitor the power system and communicate any changes to loadshedding should it be required. Unplanned outages slightly increased from 15 386 MW to 15 424MW of generating capacity, while the capacity out of service for planned maintenance increased from 5 617 MW to 6 280MW. Eskom’s load forecast for the evening peak demand is 28 123MW.

In the last 24 hours, 500MW of generating capacity was taken offline whilst in the same period 600MW were returned to service. Approximately 1 300MW of generating capacity is anticipated to return to service by Tuesday evening.

To watch Creamer Media's latest video reports, click here
 

Edited by News24Wire

Comments

 

Showroom

Werner South Africa Pumps & Equipment (PTY) LTD
Werner South Africa Pumps & Equipment (PTY) LTD

For over 30 years, Werner South Africa Pumps & Equipment (PTY) LTD has been designing, manufacturing, supplying and maintaining specialist...

VISIT SHOWROOM 
Multotec
Multotec

Multotec, recognised industry leaders in metallurgy and process engineering help mining houses across the world process minerals more efficiently,...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Magazine round up | 13 December 2024
Magazine round up | 13 December 2024
13th December 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.22 0.311s - 174pq - 2rq
Subscribe Now