https://newsletter.en.creamermedia.com

Yamana pours first gold at Cerro Moro

18th May 2018

By: Henry Lazenby

Creamer Media Deputy Editor: North America

     

Font size: - +

VANCOUVER (miningweekly.com) – Canadian gold producer Yamana Gold announced this week that it has poured the first gold and silver doré at its Cerro Moro project, in Argentina.

The operation started feeding ore to the 1 000 t/d processing plant in April, and is expected to ramp up to commercial production over the second quarter, with the bulk of gold production weighted towards the second half of the year.

The property contains a number of high-grade epithermal gold and silver veins, which are expected to be mined by a combination of openpit and underground mining. Cerro Moro is expected to produce 85 000 oz of gold and 3.75-million ounces of silver this year, rising to 125 000 oz of gold and six-million ounces of silver in 2019, and reaching 130 000 oz of gold and seven-million ounces of silver a year by 2020.

According to Yamana, the Cerro Moro project offers significant opportunities for the conversion of mineral resources into mineral reserves and for further discoveries on the property. Yamana expects to add at least another one-million ounces of gold equivalent resources to the mineral inventory over the coming years.

To this end, the company plans to convert 110 000 gold-equivalent ounces of inferred mineral resources to measured and indicated resources; discover 250 000 gold-equivalent ounces of new inferred mineral resources; and define future drill targets through scout drilling, soil and rock sampling, and mapping through its 2018 exploration programme.

Edited by Creamer Media Reporter

Comments

Showroom

The Southern African Institute of Mining and Metallurgy
The Southern African Institute of Mining and Metallurgy

The SAIMM started as a learned society in 1894 after the invention of the cyanide process that saved the South African gold mining industry of the...

VISIT SHOWROOM 
AutoX
AutoX

We are dedicated to business excellence and innovation.

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Photo of Martin Creamer
On-The-Air (15/11/2024)
15th November 2024 By: Martin Creamer

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.122 0.217s - 188pq - 2rq
Subscribe Now